My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_6.27.22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
6-27-22
>
Packet_6.27.22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2022 5:26:15 PM
Creation date
7/11/2022 5:23:11 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br /> <br />Mitigation Monitoring and Reporting Program <br /> <br /> <br />Metro East Mixed-Use Overlay District Expansion and Elan Development Projects <br /> 6 August 2018 <br />ICF 00019.18 <br /> <br />Mitigation Measure No. Mitigation Measure Monitoring Party Implementing Party Mitigation Timing MM-OZ 4.2-13 As required by South Coast Air Quality Management District Rule 403–Fugitive Dust, all construction activities that are capable of generating fugitive dust are required to implement dust control measures during each phase of project development to reduce the amount of particulate matter entrained in the ambient air. These measures include: <br /> Limiting the amount of area disturbed during site grading to 10 acres per day <br /> Application of soil stabilizers to inactive construction areas <br /> Quick replacement of ground cover in disturbed areas <br /> Watering of exposed surfaces three times daily <br /> Watering of all unpaved haul roads three times daily <br /> Covering all stock piles with tarp <br /> Reduction of vehicle speed on unpaved roads <br /> Post signs on site, limiting traffic to 15 miles per hour or less <br /> Sweep streets adjacent to the project site at the end of the day if visible soil material is carried over to adjacent roads <br /> Cover or have water applied to the exposed surface of all trucks hauling dirt, sand, soil, or other loose materials prior to leaving the site to prevent dust from impacting the surrounding areas <br /> Install wheel washers where vehicles enter and exit unpaved roads onto paved roads to wash off trucks and any equipment leaving the site each trip <br />Planning and Building Agency Project applicant During grading, construction and project implementation <br />MM-OZ 4.2-14 The developer shall require by contract specifications that the architectural coating (paint and primer) products used would have a VOC rating of 100 grams per liter or less. Contract specifications shall be included in the proposed project construction documents, which shall be reviewed and approved by the City of Santa Ana Planning and Building Agency staff. <br />Planning and Building Agency Project applicant Prior to construction <br />Apx-232 <br />6/27/2022 <br />Planning Commission 2 –392
The URL can be used to link to this page
Your browser does not support the video tag.