My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_6.27.22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
6-27-22
>
Packet_6.27.22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2022 5:26:15 PM
Creation date
7/11/2022 5:23:11 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br /> <br />Mitigation Monitoring and Reporting Program <br /> <br /> <br />Metro East Mixed-Use Overlay District Expansion and Elan Development Projects <br /> 7 August 2018 <br />ICF 00019.18 <br /> <br />Mitigation Measure No. Mitigation Measure Monitoring Party Implementing Party Mitigation Timing MM-OZ 4.2-15 The developer shall require by contract specifications that materials that do not require painting be used during construction to the extent feasible. Contract specifications shall be included in the proposed project construction documents, which shall be reviewed and approved by the City of Santa Ana Planning and Building Agency staff. <br />Planning and Building Agency Project applicant Prior to construction <br />MM-OZ 4.2-16 The developer shall require by contract specifications that pre-painted construction materials be used to the extent feasible. Contract specifications shall be included in the proposed project construction documents, which shall be reviewed and approved by the City of Santa Ana Planning and Building Agency staff. <br />Planning and Building Agency Project applicant Prior to construction <br />MM AQ-1 All applicants proposing development of projects within the MEMU Overlay Zone and expansion area shall require their contractors, as a condition of contract, to further reduce construction-related exhaust emissions by ensuring that all off-road equipment greater than 50 horsepower (hp) and operating for more than 20 total hours over the entire duration of construction activities shall operate on an EPA-approved Tier 4 or newer engine. Exemptions can be made for specialized equipment where Tier 4 engines are not commercially available within 200 miles of the MEMEU Overlay Zone and expansion area. The construction contract must identify these pieces of equipment, document their unavailability, and ensure that they operate on no less than an EPA-approved Tier 3 engine. <br />Planning and Building Agency Project applicant Prior to construction <br />MM-AQ-2 All applicants proposing development of projects within the MEMU Overlay Zone and expansion area shall require their contractors, as a condition of contract, to use diesel trucks that have 2010 model year or newer engines. In the event that 2010 model year or newer diesel trucks cannot be obtained, the contractor must provide documentation to the City showing that a good faith effort to locate such engines was conducted. If the lead agency determines that 2010 model year diesel trucks are not feasible, supported by substantial evidence in the record, then the lead agency shall require the use of trucks that meet EPA 2007 model year NOx emissions requirements, at a minimum. <br />Planning and Building Agency Project applicant Prior to construction <br />Apx-233 <br />6/27/2022 <br />Planning Commission 2 –393
The URL can be used to link to this page
Your browser does not support the video tag.