My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_6.27.22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
6-27-22
>
Packet_6.27.22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2022 5:26:15 PM
Creation date
7/11/2022 5:23:11 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br /> <br />Mitigation Monitoring and Reporting Program <br /> <br /> <br />Metro East Mixed-Use Overlay District Expansion and Elan Development Projects <br /> 8 August 2018 <br />ICF 00019.18 <br /> <br />Mitigation Measure No. Mitigation Measure Monitoring Party Implementing Party Mitigation Timing MM-AQ-3 All applicants proposing development of projects within the MEMU Overlay Zone and expansion area shall require their contractors, as a condition of contract, to reduce construction-related fugitive VOC emissions by ensuring that low-VOC coatings that have a VOC content of 10 grams/liter (g/L) or less are used during construction. The project applicant will submit evidence of the use of low-VOC coatings to SCAQMD prior to the start of construction. <br />Planning and Building Agency Project applicant Prior to construction <br />CULTURAL RESOURCES MM-0Z 4.4-1 The City of Santa Ana shall require as part of the environmental review of development projects within the Overlay Zone Expansion Area that impacts to potentially significant historical resources be considered. If any existing structures on a proposed development site are at or approaching 50 or more years of age at the time of CEQA review, the City shall retain the services of a qualified architectural historian to conduced a field survey of the structure in question and technical study to determine its potential historical potential significance and develop mitigation measures as necessary. <br />Planning and Building Agency Project applicant During environmental review of future projects <br />MM-0Z 4.4-2 Due to the lack of cultural resource studies for the Overlay Zone Expansion Area, and in order to avoid damaging any unidentified cultural resources, a qualified archaeologist would be retained to monitor any significant ground-disturbing activities in undeveloped areas within the Expansion Area, and any deep (10” or deeper) ground-disturbing activities in all areas of the Expansion Area. <br />Planning and Building Agency Project applicant During construction <br />MM-0Z 4.4-3 In the event that archaeological resources are unearthed during project subsurface activities, all earth-disturbing work within a 100-meter radius must be temporarily suspended or redirected until an archaeologist has evaluated the nature and significance of the find. After the find has been appropriately mitigated, work in the area may resume. <br />Planning and Building Agency Project applicant During construction <br />MM-0Z 4.4-5 If human remains are unearthed, State Health and Safety Code Section 7050.5 requires that no further disturbance shall occur until the County coroner has made the necessary findings as to origin and disposition pursuant to Public Resources Code Section <br />Planning and Building Agency/NAHC Project applicant During construction <br />Apx-234 <br />6/27/2022 <br />Planning Commission 2 –394
The URL can be used to link to this page
Your browser does not support the video tag.