My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL ENVIRONMENT, INC.
Clerk
>
Contracts / Agreements
>
A
>
ALL ENVIRONMENT, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:51:38 AM
Creation date
7/25/2022 3:01:06 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL ENVIRONMENT, INC.
Contract #
A-2022-064
Agency
Public Works
Council Approval Date
5/3/2022
Expiration Date
5/1/2023
Insurance Exp Date
9/14/2023
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E — RELEVANT PROJECT EXPERIENCE <br />City of Columbia, Missouri <br />Client: <br />City of Columbia Missouri — Department of Public Works <br />Contact: <br />David Nichols — Public Works Director; (573) 874-7255, david.nichols@como.go <br />Dan Darnell — Purchasing Manager 573 874-7255 dan.darnell@como.gov <br />Project <br />AEI prepared FCAs in accordance with ASTM E2018-15 on a portfolio of 23 <br />Discussion: <br />buildings owned and operated by the City of Columbia. The portfolio comprised <br />an area of 423,896 SF and consist of fire stations, a police station, a police <br />training center, armory, city hall and various office buildings and a clinic. AEI is <br />also completed bar coding of all assets and is also performed a cursory Level I <br />Energy Audit to determine if the installation of Energy Conservation Measures <br />would have any measurable impact upon energy savings. Matt Wasson, Don <br />Gerardi and Michael Novick performed field inspections. Kyle Christiansen acted <br />as the Project Executive and Project Manager and performed senior level <br />technical review. <br />Presentation: <br />AEI utilized an FCA software application with similar capabilities to Kykloud as <br />well as tablet data collection devices in developing FCA reports. AEI's project <br />deliverables include narrative FCA reports, geo-coded photos, equipment & <br />condition inventories, ADA accessibility data and cost estimates for future <br />maintenance and replacements. Key information included in the reports is each <br />building's Facility Condition Index (FCI), Expected and Remaining Useful Lives <br />(EULs & RUB) of equipment and building systems, and a 10 years capital <br />expenditure budget. All that data is integrating seamlessly with the client's <br />maintenance management software platform. <br />Date: <br />Com leted May 2018 <br />hi <br />1 <br />Il■1 . <br />w <br />n <br />Per AEI Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.