My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL ENVIRONMENT, INC.
Clerk
>
Contracts / Agreements
>
A
>
ALL ENVIRONMENT, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:51:38 AM
Creation date
7/25/2022 3:01:06 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL ENVIRONMENT, INC.
Contract #
A-2022-064
Agency
Public Works
Council Approval Date
5/3/2022
Expiration Date
5/1/2023
Insurance Exp Date
9/14/2023
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E - RELEVANT PROJECT EXPERIENCE <br />Village of Oak Park Portfolio, Oak Park, IL <br />Client: <br />Village of Oak Park Illinois <br />Contact: <br />Lisa Shelley - Village Manager — (708) 383-6400 — villagemanager@oak- <br />ark.us <br />Project Discussion: <br />AEI is preparing FCAs in accordance with ASTM E2018-15 on a <br />portfolio of 2 fire stations and 3 water pumping station buildings <br />comprising an area of 32,600 SF. AEI is capturing data in tablets and <br />utilizing KyKloud software in the preparation of the FCA reports and <br />global FCA database. Michael Novick, RA is performing field <br />inspections and preparing the FCA analysis and project management <br />and senior level technical review is being performed Matt Wasson. <br />Presentation: <br />AEI's project deliverables include narrative FCA reports, geo-coded <br />photos, equipment & condition inventories, ADA accessibility data and <br />cost estimates for future maintenance and replacements. Key <br />information to be included in the reports is each building's Facility <br />Condition Index (FCI), Expected and Remaining Useful Lives (EULs & <br />RULs) of equipment and building systems, and a 10-year capital <br />expenditure budget. <br />Date: <br />January 2020 <br />Knee <br />Oak Park <br />AEI Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.