My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL ENVIRONMENT, INC.
Clerk
>
Contracts / Agreements
>
A
>
ALL ENVIRONMENT, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:51:38 AM
Creation date
7/25/2022 3:01:06 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL ENVIRONMENT, INC.
Contract #
A-2022-064
Agency
Public Works
Council Approval Date
5/3/2022
Expiration Date
5/1/2023
Insurance Exp Date
9/14/2023
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E - RELEVANT PROJECT EXPERIENCE <br />Evergreen School District, San Jose, CA <br />Client: <br />Aedis Architects & Evergreen School District <br />John Diffenderfer — President — (408) 221-9011 — <br />jdiffenderferaedisarchitects.com <br />Project <br />AEI completed Facility Condition Assessments on a portfolio of 18 <br />Discussion: <br />elementary and middle school campuses of the Evergreen School District as <br />well as the district's main administrative offices. The portfolio comprises a <br />total building area of over 1.2MM SF. As part of this assessment, AEI is <br />completing an asset inventory and facility assessment in advance of <br />proposed renovations. AEI is working closely with the design architect and <br />school district to determine what systems and equipment can be salvaged <br />prior to the design stage of rehabilitation. Preparation of a complete <br />database of various building systems and equipment is also included in the <br />scope of work. <br />Presentation: <br />AEI utilized an FCA software application with similar capabilities to Kykloud <br />as well as tablet data collection devices in developing FCA reports. AEI's <br />project deliverables include narrative FCA reports, geo-coded photos, <br />equipment & condition inventories, ADA accessibility data and cost estimates <br />for future maintenance and replacements. Key information included in the <br />reports is each building's Facility Condition Index (FCI), Expected and <br />Remaining Useful Lives (EULs & RULs) of equipment and building systems, <br />and a 10 years capital expenditure budget. All that data is integrating <br />seamlessly with the clients maintenance management software platform. <br />Date: <br />Completed December 2018 <br />4 <br />Evergreen <br />- - <br />School District <br />- <br />s r <br />IL <br />'I AEI Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.