My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WASHINGTON SANTA ANA HOUSING PARTNERS, L.P
Clerk
>
Contracts / Agreements
>
W
>
WASHINGTON SANTA ANA HOUSING PARTNERS, L.P
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2022 5:36:18 PM
Creation date
8/4/2022 5:34:36 PM
Metadata
Fields
Template:
Contracts
Company Name
WASHINGTON SANTA ANA HOUSING PARTNERS, L.P
Contract #
A-2022-133
Agency
Community Development
Council Approval Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Crossroads at Washington Prepared March 11, 2022 <br />Washington Santa Ana Housing Partners, L.P. <br />Washington Avenue) is four (4) stories with an elevator. Building 2 (1146 E. Washington <br />Avenue) ranges from two (2) to three (3) stories and has two (2) elevators. Building 1 has a total <br />of thirty-five (35) units and Building 2 has a total of fifty-one (51) units. Each building is <br />comprised of stacked flats. The Project will include approximately 5,811 square feet of <br />Community Area with leasing and management offices, as well as 1,060 square feet of retail for <br />a community serving use. <br />The proposed design of the Project will feature an inward -facing orientation that creates buffered <br />courtyards in order to accommodate for the adjacent Santa Ana Freeway to the east of the project <br />and the industrial building backdrop to the west. <br />The Project is designed to keep in mind its, urban context as well as the needs of its future <br />families and special needs residents. The Project includes multiple on -site amenities for its <br />residents, including a pool, tot lot, courtyards, laundries, leasing/management offices, BBQ <br />pavilion, and a dog run. <br />The Project was fully entitled on February 24, 2020. <br />Parkin¢ <br />The Project will provide one hundred and twenty (120) parking spaces in an on -grade parking <br />lot, which includes accessible parking and Electric Vehicle ("EV") parking. Thirty-eight (38) of <br />the one hundred and twenty (120) spaces utilize tandem parking. <br />Landscaain¢ <br />The landscaping concept consists of a drought -tolerant and native plant palette where feasible <br />that complements the Project architecture and is consistent with the overall landscape in the <br />adjacent neighborhood. <br />Floor Plans and Unit Amenities <br />The design of the space considers layouts to ensure livability for residents. Units meet or exceed <br />established minimum requirements for area and amenities. The breakdown of unit type by square <br />footage is summarized below: <br />• Sixteen (16) studio/one bath units at 400 ft. <br />• Twenty-six (26) one-bedroom/one bath units at 600 ft2. <br />• Twenty-two (22) two-bedroom/one bath units at 815 112. <br />• Seventeen (17) three-bedroom/two bath units at 1,100 ft. <br />• Five (5) four-bedroom/two bath units at 1,300 ft2. <br />Unit amenities include: <br />• Bathroom fixtures and finishes. <br />• Kitchen fixtures, finishes, and cabinets. <br />• Energy Star rated appliances including stove/oven and refrigerators. <br />• Energy efficient lighting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.