My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BYROM-DAVEY, INC. (SANTA ANITA PARK NEW SYNTHETIC SOCCER FIELD & PARK IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
BYROM-DAVEY, INC. (SANTA ANITA PARK NEW SYNTHETIC SOCCER FIELD & PARK IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 12:32:54 PM
Creation date
8/9/2022 8:48:05 AM
Metadata
Fields
Template:
Contracts
Company Name
BYROM-DAVEY, INC. (SANTA ANITA PARK NEW SYNTHETIC SOCCER FIELD & PARK IMPROVEMENTS)
Contract #
P 19-7527
Agency
Public Works
Council Approval Date
7/19/2022
Expiration Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` '' CITY OF SANTA ANA <br /> - a i PUBLIC WORKS AGENCY <br /> • CONTRACT CHANGE ORDER <br /> „v, <br /> Project Number Project No. 19-7527 Santa Anita Park Change Order Number 6 <br /> To Byrom-Davey, Inc Contractor <br /> You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> EXTRA WORK AT AGREED PRICE <br /> 1. To compensate the contractor for the cost increase for masonry labor and materials due to delayed <br /> start date per PCO CC-01, dated March 20, 2024. <br /> AGREED PRICE = $18,576.00 <br /> 2. To compensate the contractor for the cost increase in concrete labor and materials due to the <br /> delayed start date per PCO CC-02 dated February 12th, 2024. <br /> AGREED PRICE = $58,262.00 <br /> 3. To compensate the contractor for costs incurred due to plan changes from the bid set to the <br /> permitted set of drawings, including the installation of the interior wall footing per detail 4/S301, <br /> adjustment of the water line size in the Police Sub-Station Building from 1-1/4"to 1-1/2", and the <br /> addition of ten W8X10 beams with associated detailing, materials, fabrication, and installation, per <br /> PCO CC-03 dated March 20th, 2024. <br /> AGREED PRICE = $30,766.00 <br /> 4. To compensate the contractor for the design and installation of a complete NFPA 13 water-based <br /> fire sprinkler system, including all associated materials, equipment, labor, and permits, as well as <br /> compliance with OCFA standards and plan check requirements, per PCO CC-04 dated April 15th <br /> 2024. <br /> AGREED PRICE = $75,472.00 <br /> 5. To compensate the contractor for the excavation and removal of 4" of existing subgrade around the <br /> perimeter of the step, and the installation of a 30" structural slab with a 4" thickness at the exterior <br /> face of the masonry wall, per PCO CC-06 dated April 25th, 2024. <br /> AGREED PRICE = $36,750.00 <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.