t <br /> 6. To compensate the contractor for the installation of new furring walls for plumbing piping, including <br /> metal stud framing, drywall, and finishing, per PCO CC-07 dated May 9th, 2024. <br /> AGREED PRICE = $13,376.00 <br /> 7. To compensate the contractor for the removal of mechanical screens and the increase in heights of <br /> masonry parapet walls per the revised drawing attached to RFI #CC-002, per PCO CC-08 dated <br /> May 13th, 2024. <br /> AGREED PRICE = $18,708.00 <br /> 8. To compensate the contractor for the addition of the domestic and irrigation water connections at <br /> the street, per PCO CC-11 dated June 21 st, 2024. <br /> AGREED PRICE = $119,826.00 <br /> 9. To compensate the contractor for the addition of 290 LF of drainage and 170 LF of sewer, with no <br /> additional water lines, per PCO CC-12 dated July 2nd, 2024. <br /> AGREED PRICE = $120,170.00 <br /> 10. To compensate the contractor for the engineering design, plan submittal, equipment, installation, <br /> programming, and testing of the fire alarm system, per PCO CC-13 dated June 4th, 2024. <br /> AGREED PRICE = $71,899.00 <br /> 11. To compensate the contractor for the engineering re-design of the existing pool, per PCO CC-15 <br /> dated July 18th, 2024. <br /> AGREED PRICE = $115,105.00 <br /> 12.To compensate the contractor for a new planting area, new walkway light fixtures, new <br /> exercise equipment stations, and a stabilized DG with bender board, per PCO CC-17 dated <br /> April 3, 2023. <br /> AGREED PRICE = $117,474.00 <br /> 13.To compensate the contractor for increased City building and demolition permits <br /> reimbursement required by the City per PCO CC-19 dated September 04, 2024. <br /> AGREED PRICE = $24,002.00 <br /> TOTAL AGREED PRICE=$820,386.00 <br /> Page 2 of 3 <br />