My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BYROM-DAVEY, INC. (SANTA ANITA PARK NEW SYNTHETIC SOCCER FIELD & PARK IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
BYROM-DAVEY, INC. (SANTA ANITA PARK NEW SYNTHETIC SOCCER FIELD & PARK IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2026 10:37:09 AM
Creation date
8/9/2022 8:48:05 AM
Metadata
Fields
Template:
Contracts
Company Name
BYROM-DAVEY, INC. (SANTA ANITA PARK NEW SYNTHETIC SOCCER FIELD & PARK IMPROVEMENTS)
Contract #
P 19-7527
Agency
Public Works
Council Approval Date
7/19/2022
Expiration Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Install of burglar bars for roof penetrations in Building 300 per PCO CC-47. <br /> AGREED COST: $36,990.00 <br /> 9. Added roof Insulation in the required rooms below roof area in building located at HVAC <br /> ductwork penetrates the roof deck per PCO CC-50. <br /> AGREED COST: $8,386.00 <br /> 10. Labor and material increase associated with painting scope due to pricing changes from the <br /> time of bid per PCO CC-51. <br /> AGREED COST. $15,372.00 <br /> 11. Install of fire-smoke damper in exhaust ductwork serving restroom areas per PCO CC-52. <br /> AGREED COST: $8,069.00 <br /> 12. Relocation of electrical and data outlet to accommodate furniture installation per PCO CC-53. <br /> AGREED COST: $31,173.00 <br /> 13. Install of new CMU trash enclosure in accordance with the approved Planning and Building set <br /> per PCO CC-55. <br /> AGREED COST: $21,622.00 <br /> 14. Install of 2-Hour fire rated wall to comply with Planning and Building requirements per PCO CC- <br /> 56. <br /> AGREED COST: $25,000.00 <br /> 15. Install of bent plates and tube steel at building corners to support steel decking per PCO CC-57. <br /> AGREED COST: $6,316.00 <br /> 16. Cost for increased associated with irrigation &landscape scope due to pricing changes from the <br /> time of bid per PCO CC-58. <br /> AGREED COST: $18,398.00 <br /> 17. Southern California Gas permit design and install per PCO CC-59. <br /> AGREED COST: $14,573.00 <br /> 1B. Excavation and compaction support required for the asphalt parking lot per PCO CC-61. <br /> AGREED COST: $6,259.00 <br /> 19. Cost increase of labor and material associated with self-performed work since time of bid per <br /> PCO CC-62. <br /> AGREED COST: $12,048.00 <br /> 20. Install of 4'x4" PVC-coated clad metal drip edge per PCO CC-63. <br /> AGREED COST: $19,095.00 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.