Laserfiche WebLink
DNUPFIRE & LIFE SAFETY LEGENDPATH OF EGRESSNUMBER OF OCCUPANTS EXITING SPACE1026NO. OF OCCUPANTSGROSS1,340 SFBUSINESS (B)OPEN OFFICEGROSS205 SFBUSINESS (B)OFFICEGROSS391 SFBUSINESS (B)OFFICEGROSS504 SFBUSINESS (B)OFFICEGROSS312 SFBUSINESS (B)OFFICEGROSS379 SFBUSINESS (B)OFFICE391 SF ÷ 150 = 3 OCC.205 SF ÷ 150 = 2 OCC.504 SF ÷ 150 = 4 OCC.312 SF ÷ 150 = 2 OCC.379 SF ÷ 150 = 3 OCC.1,340 SF ÷ 150 = 9 OCC.3242395631111 OCC. x 0.2" = 2.2" REQ.36" DOOR WIDTH PROVIDED23TOTAL OCCUPANTS11 OCC. x 0.3" = 3.3" REQ.60" STAIR WIDTH PROVIDED1212 OCC. x 0.3" = 3.6" REQ.50" STAIR WIDTH PROVIDEDFEFE(OPEN TO BELOW)LEGENDBUSINESS (B)EXIST. CONC. WALL TO PROVIDE A 3-HR FIRE WALL (PER CBC TABLE 706.4) M. STEVENCAMPC-18,407JUN. 30, 2022RENEWAL DATES TATEOFCALIFORNIALICENSEDARCHITEC T M. Steven Camp, Principal Architect6B Liberty #100, Aliso Viejo, CA 92656 Tel. 949.488.0865, Fax. 949.488.0864www.elementsarch.comstevec@elementsarch.comARCHITECT:PROJECT / LOCATION:TENANT IMPROVEMENT2909 DAIMLER STREETSANTA ANA, CA 92705CUP SUBMITTAL - JANUARY 28, 2022AREA / EGRESS PLANA2-5AREA TABULATIONS (2ND FLOOR)ROOMNO.ROOM NAME OCCUPANCY GROUP AREA201 OPEN OFFICE BUSINESS (B) 1,340 SF202 OFFICE BUSINESS (B) 379 SF203 OFFICE BUSINESS (B) 312 SF204 OFFICE BUSINESS (B) 504 SF205 OFFICE BUSINESS (B) 391 SF206 OFFICE BUSINESS (B) 205 SF3,131 SFGRAND TOTAL: 3,131 SF1/8" = 1'-0"1SECOND FLOOR8/22/2022Planning Commission 1 – 19