My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_8-22-22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
8-22-22
>
Packet_8-22-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 2:43:39 PM
Creation date
8/23/2022 2:40:36 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(E), V.I.F.12' - 0"(E), V.I.F.22' - 0"EXIST. ROLL-UP DOORS TO BE REMOVED AND FILLED-IN WITH NEW WALL WITH PAINTED CORRUGATED METAL PANEL CLADDING(E), V.I.F.14' - 0"(E), V.I.F.22' - 0"NEW STOREFRONT & DOORS - ALUM. & GLAZING TINT TO MATCH EXISTING ADJACENT, TYP.20'-0" WIDE X 7'-0" DEEP GALVANIZED METAL CHANNEL-FRAMED CANOPY, WITH TRANSLUCENT PLEXIGLASS TOP & STAINLESS STEEL CABLE SUSPENSION SYSTEM4' - 0"11' - 3"3' - 4"2909 DAIMLER100' - 6"25' - 0"NEW SIGNAGE AT FRONT ELEVATION FACING (DAIMLER) STREETM. STEVENCAMPC-18,407JUN. 30, 2022RENEWAL DATES TATEOFCALIFORNIALICENSEDARCHITEC T M. Steven Camp, Principal Architect6B Liberty #100, Aliso Viejo, CA 92656 Tel. 949.488.0865, Fax. 949.488.0864www.elementsarch.comstevec@elementsarch.comARCHITECT:PROJECT / LOCATION:TENANT IMPROVEMENT2909 DAIMLER STREETSANTA ANA, CA 92705CUP SUBMITTAL - JANUARY 28, 2022EXTERIOR ELEVATIONSA3-11/8" = 1'-0"1SOUTHEAST ELEVATION1/8" = 1'-0"2PARTIAL SOUTHWEST ELEVATION1/8" = 1'-0"3NORTHWEST ELEVATION8/22/2022Planning Commission 1 – 20
The URL can be used to link to this page
Your browser does not support the video tag.