My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC (2)
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2022 10:21:18 AM
Creation date
9/12/2022 10:17:49 AM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC
Contract #
A-2022-157-02
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
6/30/2025
Insurance Exp Date
5/19/2023
Destruction Year
2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEE Schedule <br />Task Order Basis <br />Actual Quantities "To Be Determined" <br />Rates include Supervision, Overhead & Profit. <br />Rates include CPE's markup. <br />Item <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />Condition(s): <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />Pavement Rehab <br />Hourly Rate (w/ Hourly Overtime Hourly Doubletime <br />nperrintinn CPE's markup) Rate Rate <br />Superintendent <br />$259.60 <br />$389.40 <br />$519.20 <br />Foreman <br />$224.20 <br />$336.30 <br />$448.40 <br />Grade Checker <br />$171.10 <br />$256.65 <br />$342.20 <br />Labor/Raker <br />$159.30 <br />$238.95 <br />$318.60 <br />Finisher/mason <br />$159.30 <br />$238,95 <br />$318.60 <br />BG Operator <br />$171.10 <br />$256.65 <br />$342.20 <br />Operator <br />$171.10 <br />$256.65 <br />$342.20 <br />Screedman <br />$171.10 <br />$256.65 <br />$342.20 <br />Rollerman <br />$171,10 <br />$256.65 <br />$342.20 <br />4-Hour Minimum. <br />(18% Total Hourly Rate <br />Paving Machine (10) <br />$300.00 <br />118% <br />$354.00 <br />Paving Machine (7-8') <br />$260.00 <br />118% <br />$306.80 <br />Bobtail <br />$240.00 <br />118% <br />$283.20 <br />Bobtail w/Breaker <br />$270.00 <br />118% <br />$318.60 <br />Bobtail w/Sweeper <br />$255.00 <br />118% <br />$300.90 <br />Bobtail w/Grinder <br />$635.00 <br />1180% <br />$749.30 <br />AC Grinder (4') <br />$805.00 <br />118% <br />$949.90 <br />AC Grinder (6'-8') <br />$1,035.00 <br />118%1 <br />$1,221.30 <br />Water Truck <br />$210.00 <br />118% <br />$247.80 <br />Roller (6.8 tn) <br />$155,00 <br />118% <br />$182.90 <br />Roller (3-5 tn) <br />$135.00 <br />118%" <br />$159.30 <br />Skip Loader <br />$265.00 <br />118% <br />$312.70 <br />Skip Combo <br />$295.00 <br />118% <br />$348.10 <br />Blade 12G <br />$265.00 <br />118% <br />$312.70 <br />Blade 140G <br />$275.00 <br />118% <br />$324.50 <br />Backhoe <br />$275.00 <br />118% <br />$324.50 <br />Backhoe w/Breaker <br />$345.00 <br />118% <br />$407.10 <br />950 Loader <br />$300.00 <br />118% <br />$354.00 <br />966 Loader <br />$355.00 <br />118% <br />$418.90 <br />Street Sweeper <br />$240.00 <br />118% <br />$283,20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.