Laserfiche WebLink
21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />Arrow Board <br />$115.00 <br />118/ <br />$135.70 <br />Truck -Super 10 <br />$195.00 <br />118% <br />$230.10 <br />Truck -10 Wheel <br />$190.00 <br />1180% <br />$224.20 <br />Truck - Semi <br />$200.00 <br />1180/. <br />$236.00 <br />Truck -High Side <br />$225.00 <br />118% <br />$265.50 <br />Tack Truck <br />$235.00 <br />118% <br />$277.30 <br />Tack Wagon <br />$115.00 <br />118% <br />$135.70 <br />Conc Form Truck (excludes material) <br />$110.00 <br />118% <br />$129.80 <br />Crew Truck <br />$115.00 <br />118% <br />$136.70 <br />Concrete Saw <br />$260.00 <br />118% <br />$306.80 <br />Core Machine <br />$260.01 <br />.80 <br />Berm Machine <br />$150.00 <br />118% <br />$177.00 <br />Sub Condition(s); f) Rates include Supervision, Overhead & Profit. <br />2) Price subject to change without notice. <br />3) Labor rates are billed with 4 or 8 hour clauses. <br />4) Equipment & Labor moved for specifically for extra work to be billed with 8 hour minimum. <br />5) Mobilization. 2 Nrs/Equipment - Minimum One Way. <br />6) $6,500.00 Mobilization Fee for Callout during business hours. <br />7) $15,000.00 Mobilization Fee for Callout after business hours. <br />