1. STATEMENT OF QUALIFICATIONS
<br />ARDURRA
<br />May 24, 2022
<br />City of Santa Ana -Water Resources Division
<br />Attn: Water Engineering
<br />220 S Daisy Ave (M-85)
<br />Building A, 2nd Floor
<br />Santa Ana, CA 92703
<br />SUBJECT: PROPOSAL TO PROVIDE ON -CALL WATER RESOURCES ENGINEERING SERVICES
<br />SUPPORTING CATEGORIES 14 (RFP: 22-002)
<br />Dear Selection Committee Members,
<br />a. COVER LETTER
<br />Ardurra Group, Inc. (Ardurra) appreciates this opportunity to present our qualifications to the City of Santa Ana to provide on -call
<br />water resources engineering services in support of the Water Resources Division. We are submitting this proposal for four categories:
<br />1) Planning, Resources, and Design; 2) Construction Management; 3) Pipeline Design; and 4) Electrical, Instrumentation &
<br />Control. We have assembled a team ready to provide the full range of services necessary for the successful delivery of your projects.
<br />Selecting the Ardurra team offers the City the following benefits:
<br />Hands-on, dedicated contract manager supported by a team ready to assist through each phase of your projects.
<br />We take pride in our ability to embed ourselves as an extension of staff and continuously and professionally keep our client's best
<br />interest at the forefront. Our Contract Manager, Mark Lewis, PE, TE, is a proven leader with extensive water utility experience,
<br />including 13 years as the Director of Public Works/City Engineer at the City of Fountain Valley where he directed the operations,
<br />maintenance, and capital improvements of a full -service water system with an annual demand of approximately 10,000 acre feet
<br />(AF), over 17,500 connections, two 5-million-gallon (MG) reservoirs, six water production wells, and 1,700-AF demand and service
<br />for reclaimed/recycled water. He applies this expertise along with innovative and cost -saving solutions to all of his projects.
<br />The capacity to provide the right staff at the right time. We have a deep bench of in-house engineers, hydraulic modelers,
<br />condition assessment experts, environmental compliance specialists, construction managers, and inspectors. Our team is
<br />competent, responsive, and conforms to California Building Standards Code/Title 24, City standards, codes and ordinances, federal
<br />grant requirements, Caltrans Local Assistance Procedures Manual (LAPM), Greenbook, APWA standards, AWWA standards and,
<br />where appropriate, LEED, DSA, and OSHPD standards.
<br />Ardurra has authorized Lisa Penna to sign this proposal and bind the firm.
<br />We look forward to teaming with the City and assisting with delivery of your projects. Please feel free to contact us should you have any
<br />questions or require additional information.
<br />Respectfully submitted,
<br />Lisa M. Penna, PE, F.ASCE, QSD
<br />Vice President, Regional Director
<br />Cell: 949.922.2800 1 Email: Ipenna@ardurra.com
<br />Robert Weber, PE
<br />Southwest Water Practice Director
<br />Direct: 858.842.6978 1 Email: rweber@ardurra.com
<br />3737 Birch Street, Suite 250 1 Newport Beach, CA 92660 1 949.428.1500 1 www.ardurra.com
<br />
|