My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARDURRA GROUP, INC.
Clerk
>
Contracts / Agreements
>
A
>
ARDURRA GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:56:02 AM
Creation date
9/27/2022 4:34:45 PM
Metadata
Fields
Template:
Contracts
Company Name
ARDURRA GROUP, INC.
Contract #
A-2022-158-02
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
1/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Not only is Ardurra successful at delivering <br />CM and inspection services, but our CM <br />and inspection professionals are considered <br />leaders in the industry. They are frequently <br />engaged to train public agency staffs and <br />develop or improve standardized public <br />agency department systems, procedures, <br />and processes that incorporate industry <br />best practices across capital project and <br />development permit delivery. <br />Project Controls/Document Control <br />We utilize highly effective administrative <br />and clerical support as well as web -based <br />construction management and document <br />controls tools and procedures developed <br />by construction managers and staff. These <br />tools are scalable and can easily be tailored <br />to fit the Cit 's ro'ect delive a roach <br />Y P l ry P P <br />Timely and concise communications are <br />essential to the successful completion <br />of any construction project. Protocol will be determined as <br />appropriate for each project and maintained for the project <br />duration. Ardurra equips its CM team with the state-of-the-art <br />in electronic management hardware and software, such that <br />electronic documentation is utilized for as much of the required <br />documentation as possible. The Ardurra CM team is well -versed <br />in serving as the primary project contact, acting as the hub of <br />communication with timely distribution of requisite correspondence <br />and documentation to all respective stakeholders as applicable. <br />In addition to time -tested and efficient construction administration <br />and project controls procedures, documents, and programs, <br />Ardurra offers the web -based collaboration of Procore. Procore is <br />a widely used cloud -based construction software that maximizes <br />the efficiency of managing construction projects while connecting <br />project participants to critical project documents and real-time <br />project data. <br />The Ardurra project controls process includes a detailed file <br />indexing system for all project hard files. Ardurra has already <br />developed customized forms, a reports database structure, and <br />work breakdown structure well suited for typical public works <br />projects. We will adapt our system to the specific needs of the <br />project to monitor, track, and control the project. This detailed <br />tracking system will enable us to provide an accurate assessment <br />of the progress to the City with recommendations to maintain or <br />improve adherence to the approved project schedule. <br />Category 3. Pipeline Design <br />Our team's pipeline experience with public agencies extends <br />from alignment planning and hydraulic modeling to condition <br />assessment and rehabilitation of existing pipelines. Trenchless <br />Example Inspector Daily Report <br />pipeline design and construction is also one <br />our specialties. <br />Our pipeline experience encompasses <br />water and recycled water pipes, gravity <br />sewers and force mains, with sizes up to <br />96-inch diameter and all pipe types including <br />commonly used welded steel, PVC, and DI, <br />as well as pipe materials selected for special <br />applications such as FRP, and HDPE and <br />fusible PVC for trenchless construction. Our <br />services have spanned hydraulic analyses, <br />alignment studies, preliminary and final <br />design, and construction support. We are <br />experienced at designing and constructing <br />pipelines under emergency conditions, <br />through sensitive habitats and creeks, in <br />highly developed residential areas, across <br />o I rt <br />pen rura prope y, an wi in exis ing <br />pavement traveled by daily commuters. <br />Some example pipeline projects include: <br />• Vallecitos Water District High Point Waterline (condition <br />assessment) <br />• City of Pomona District 1, 4, & 6 Water Main Replacement <br />(11,127 LF 6-inch, 16-inch, and 18-inch ductile iron) <br />• City of San Diego Upas Street Pipeline Replacement (14,980 <br />LF 8-inch to 12-inch PVC; 8,160 LF 24-inch CML&C; 1,640 LF <br />30-inch HDPE HDD) <br />• Fallbrook Public Utility District Santa Margarita Conjunctive <br />Use Project Pipelines (2 miles 24-inch CML&C) <br />• City of Carlsbad La Costa Recycled Water Pipeline (5,800 LF <br />8-inch PVC) <br />• City of Solana Beach Recycled Water Pipeline Extension — <br />Phase 1 (5,900 LF 4-inch to 6-inch PVC) <br />• Leucadia Wastewater District Recycled Water Pipeline Repair <br />Project (381 LF HDD 14-inch fusible PVC) <br />• Vallecitos Water District Discovery Street Sewer Replacement <br />(4,000 LF 12-inch/15-inch gravity sewer) <br />• Vallecitos Water District Land Outfall Canyon (6,000 LF 24-inch <br />DIP inverted siphon sewer) <br />La Costa Recycled Water Pipeline <br />City of Carlsbad <br />City Of Santa And water Resources Division f 5 /�j ARDURRA <br />RFP 22-002 1 May 24, 2022 L <br />
The URL can be used to link to this page
Your browser does not support the video tag.