My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARDURRA GROUP, INC.
Clerk
>
Contracts / Agreements
>
A
>
ARDURRA GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:56:02 AM
Creation date
9/27/2022 4:34:45 PM
Metadata
Fields
Template:
Contracts
Company Name
ARDURRA GROUP, INC.
Contract #
A-2022-158-02
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
1/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Encinitas Olivenhain Trunk Sewer <br />Improvements (2,800 LF 15-inch trunk sewer) <br />City of Oceanside Buena Vista Force Main Replacement <br />(9,000 LF 24-inch PVC Auger bore & microtunnel) <br />City of Oceanside Condition Assessment and Sewer <br />Improvements (17,000 LF 24-inch sewer; 12,000 LF 42-inch <br />force main) <br />Category 4. Electrical, Instrumentation & Control <br />Our team has experience with design, implementation, and <br />project management of electrical system improvement and <br />SCADA projects for water and wastewater treatment plants. Our <br />expertise includes performing SCADA condition assessments, <br />data analysis, creating HMI and PLC programming standards, and <br />upgrading software and hardware. We have performed significant <br />work helping clients decide how to move forward and then <br />implement new solutions. Ardurra does this by working closely <br />with staff, sometimes as staff augmentation, to learn what their <br />concerns and needs are. Based on our extensive experience we <br />then make recommendations on how to remedy those concerns. <br />Example projects include: <br />• City of Oceanside Water Department SCADA System Upgrade <br />(overall system redesign, various system and application <br />upgrades, replacement of 3 legacy HMIs and 100 PLCs, <br />installation of 2.4-GHz radio network, installation of over 20 <br />new servers) <br />• Oklahoma City Water Utilities Trust Witcher Pump Station <br />(replacement of the lagoon pumps, electrical gear, and the <br />installation of new emergency generators along with paralleling <br />switchgear at the main pump station) <br />• South Holly Water Treatment Plant High Service Pump <br />Station Motor and Switchgear Replacement and Electrical <br />Improvements (replacement of medium voltage motor <br />control centers, transformers, 480V motor control centers, <br />instrumentation and control design) <br />A COMPREHENSIVE TEAM COMMITTED TO <br />YOUR SUCCESS <br />We understand the key issue for providing effective services is <br />to be highly responsive and have the depth of resources locally <br />available to fulfill your project needs. You will see this deep <br />bench of local resources that we offer on the organization chart <br />illustrated on the following page. <br />Our team is comprised of highly competent and experienced <br />professionals who have numerous years of experience and <br />an excellent history of success delivering water and sewer <br />infrastructure and facilities —from preliminary planning to <br />construction to post -construction and start-up. <br />Our staff members are well -trained in problem solving. We <br />process all issues with a sense of urgency and present our clients <br />POINT OF CONTACT <br />Mark Lewis, PE, TE <br />Ardurra Project Director, <br />Municipal Services <br />3737 Birch Street, Suite 250 <br />Newport Beach, CA 92660 <br />Cell: 949.677.0391 <br />Email: mlewis@ardurra.com <br />with suggested alternatives, cost and schedule affects, and <br />recommended solutions that best suit the interests of the project <br />and the City. Ardurra's effective and expeditious communication <br />with all parties has enabled our team to identify conflicts, <br />environmental concerns, construction problems, and coordination <br />issues early, thus minimizing delays and reducing cost. <br />Team Availability <br />We are there when you need us! Ardurra's wide range of <br />in-house capabilities enables us to provide the right staff at the <br />right time. <br />The Ardurra team is available and ready to start working <br />immediately on any task defined by the City. Our team members <br />have a track record of delivering projects on schedule, and our <br />service is greatly facilitated by the working relationships we have <br />in place with our local specialty subconsultants. If an accelerated <br />project delivery schedule is required, Ardurra has the depth to add <br />more staff to get the work done. Our project managers are adept <br />at allocating the right resources with the best mix of availability <br />and expertise for the task assigned, and they can draw from our <br />deep bench of experienced professionals to serve a large number <br />of concurrent projects as needed. <br />The table on page 8 shows the estimated percentage of time <br />available for our key personnel. <br />Resumes of Key Personnel <br />We have provided resumes for our key personnel as well as our <br />subconsultants in Appendix B. We would be happy to provide <br />resumes for our additional staff upon the City's request. <br />Specialty Services <br />We have augmented our team with specialized subconsultants <br />who are experts in their respective fields. Ardurra has worked <br />extensively with many of these exceptional firms. This long- <br />standing alliance enables a streamlined approach and smooth <br />coordination. Following the organization chart is a brief overview <br />of the qualifications for our subconsultant partners. <br />/�/ARDURRA [ 6 ] OtyofSantaAna Water Resources Division <br />RFP 22-002 1 May 24, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.