My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARDURRA GROUP, INC.
Clerk
>
Contracts / Agreements
>
A
>
ARDURRA GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:56:02 AM
Creation date
9/27/2022 4:34:45 PM
Metadata
Fields
Template:
Contracts
Company Name
ARDURRA GROUP, INC.
Contract #
A-2022-158-02
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
1/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pipeline Design Technical Approach <br />• System and pump hydraulics/surge effects <br />• Alignment selection and easement acquisition <br />• Pipeline separation requirements <br />• Utility crossings, summarized on plan and profile sheets <br />• Corrosion issues, specialty coatings and materials <br />• Geotechnical/foundation conditions <br />• Environmental constraints <br />• Operation and maintenance issues <br />• Contracting strategies, scheduling, and budget control <br />• Traffic control <br />• Construction impacts (i.e., noise, dust) <br />• Compliance with regulatory requirements <br />• Where trenchless pipe construction is utilized, classification by <br />OSHA <br />• Mining and tunnel unit (>30-inch diameter) <br />• Preparation of SWPPPs and other compliance requirements <br />for the State's General Construction Permit and County <br />• For pipes in the public right-of-way, compliance with local agency <br />municipal codes and ordinances regarding utility installations, <br />traffic control, street resurfacing, and potholing activities <br />Typically, the most challenging aspect of underground pipeline <br />design and construction is definition of existing facilities or utilities, <br />particularly when there is sparse or no information. Our team utilizes <br />a methodical and detailed utility research and plotting procedure that <br />provides for a high level of confidence with respect to the locations of <br />subsurface utilities. Our procedure is generally outlined as follows: <br />✓ Upon authorization by the City, contact USA Dig -Alert to <br />obtain a pre -planning request, which provides a listing <br />of existing utility agencies in the project areas. Establish <br />one point of contact at Ardurra to serve as project <br />utility coordinator and be responsible for tracking and <br />documenting all utility requests and responses. <br />✓ From the USA Dig -Alert pre -planning list, contact all utility <br />agencies in or around the proposed work area to establish <br />contact information and lines of communication. <br />✓ Send to each utility agency a Utility Notice of Planned <br />Improvements to formally request their system maps and <br />record drawings. <br />✓ The project utility coordinator will review information received <br />for responsiveness and completeness, and will follow up with <br />phone calls or in -person visits to agencies as necessary. <br />✓ Plot the utilities, along with proposed horizontal and vertical <br />alignments (depending on submittal milestone). Send <br />to each agency a set of plans for conflict check at each <br />submittal milestone. Incorporate comments as necessary. <br />✓ Once the utility base map is established, perform QA/ <br />QC including a field review to determine if all the plotted <br />information is accurate with field conditions. <br />✓ If necessary, perform potholing to obtain actual field data <br />for key utility crossings or parallel utilities of interest. <br />✓ Document and track the process at each step. Agencies <br />are sent plans at each milestone regardless of whether <br />or not there are conflicts, or conflicts have been resolved, <br />due to potential changes in alignment, existing utilities, or <br />agency review personnel. <br />✓ All utility information is plotted in the plan and profile sheets <br />and summarized in a crossing table. <br />Our utility research procedure has resulted in an excellent <br />track record of avoiding conflicts during pipeline construction. <br />Sewage Lift Station Technical Approach <br />• Review of system hydraulics and pump selection <br />• Lift station control strategies and integration into SCADA system <br />• Integration into energy management system and time of use <br />pumping <br />• Electricallinstrumentation requirements <br />• Power supply and standby power <br />• Site selection and acquisition <br />• Seismic/structural issues <br />• Corrosion issues, specialty coatings and materials <br />• Odor control <br />• Operation and maintenance issues <br />• Contracting strategies, scheduling, and budget control <br />• Noise, aesthetics, and community concerns <br />• Safety pre -use analysis <br />• Emergency storage <br />Pump Station Technical Approach <br />• Review of system hydraulics and pump selection <br />• Booster station control strategies and integration into SCADA <br />system <br />• Integration into energy management system and time of use <br />pumping <br />• ElectricaVinstrumentation requirements <br />• Power supply and standby power <br />• Site selection and acquisition <br />• Seismic/structural issues <br />• Corrosion issues, specialty coatings and materials <br />• Operation and maintenance issues <br />• Contracting strategies, scheduling, and budget control <br />• Noise, aesthetics, and community concerns <br />• Safety pre -use analysis <br />Storage Facility Technical Approach <br />• System hydraulics <br />• Tank type <br />• Site configuration <br />• Geotechnicallfoundation conditions <br />• Earthwork and grading <br />• Water quality and circulation <br />ARDURRA [ 12 ] City ofSanta Ana Water Resources Division <br />RFP 22-002 1 May 24, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.