F
<br />Safety Improvements at 18 Sites. The project included
<br />design services for 18 sites requiring safety upgrades. A
<br />PDR was prepared as well as final design services including
<br />drawings and specifications. Key components of the project
<br />included design of safety handrails, ladder anchor posts,
<br />sealed block -self retracting lifeline, fixed ladders, safety
<br />guardrails, davit arms, and other safety improvements and
<br />retrofits at existing sites.
<br />Capital Improvement Projects I City of Anaheim
<br />Ardurra provides project
<br />management and construction
<br />management services to
<br />oversee completion of more
<br />than $57 million in capital
<br />improvement projects for the
<br />City of Anaheim since 2017.
<br />Projects and services have
<br />included the following:
<br />• Fire Station No. 5. Contract
<br />administration and CM
<br />for $5.4M design -build
<br />construction of a 9,400-SF
<br />fire station on one acre
<br />tht' Idd k'
<br />Client Contact
<br />City of Anaheim
<br />Jake Hester, Water Engineerir
<br />& Design Manager
<br />714.765.4421
<br />jhester@anaheim.net
<br />Year Completed
<br />Ongoing since 2017
<br />Consultant Project Managers
<br />OmarAlameddine
<br />a inc u e par ing,
<br />driveways, sidewalks, walls, fences, landscaping, water, sewer
<br />gas, telephone/cable and electrical utilities, transmissions lines
<br />and facilities. Winner of 2018 BEST Award from the APWA
<br />Southern California chapter.
<br />• Indiana Street Water Main Replacement. One of the City's
<br />first design -build projects. This design -build project consists
<br />of the construction of approximately 2,400 LF of 6-inch ductile
<br />iron CL 52 zinc -coated water main, and 200 LF of 8-inch ductile
<br />iron CL 52 zinc -coated water main. The project also included
<br />the replacement of fire hydrants, valves, water services, and
<br />appurtenant structures.
<br />• Imperial Highway and Big Sky Lane Water Main
<br />Replacement. This design -build project consists of the
<br />construction of approximately 3,580 LF of 12-inch C909 water
<br />main,1,542 LF of 8-inch C909 water main, and 250 LF of
<br />4-inch C909 water main.
<br />• Santa Ana St. Railroad Water Main Crossing with Metrolink/
<br />SCRRA, This project consists of boring and jacking trenchless
<br />installation method, furnishing, and installing approximately 70
<br />LF of 24-inch steel casing pipe welded joints and 12-inch zinc -
<br />coated ductile iron pipe class 56 and by open -cut construction
<br />method, furnishing and installing approximately 75 LF of 12-inch
<br />zinc -coated ductile iron pipe class 52.
<br />• Citywide Sanitary Sewer Improvement Program/Projects,
<br />Group 6. Contract administration and CM for $2M project
<br />to build more than 4,200 LF of 24-inch,18-inch,15-inch and
<br />10-inch VCP sewer mainline. Included 19 manholes, removing
<br />the existing mainline and manholes, rebuilding the street and
<br />installing new traffic loops, striping and pavement markers.
<br />• La Palma Water Complex — Reservoir Rehabilitation and
<br />Pump Station Replacement. Provided contract administration
<br />for $9.3M project. Managed demolition of 3-MG reservoir and
<br />pump station and rehabilitation of 4-MG reservoir, construction
<br />of new pump station, and abandonment of inactive well.
<br />• Olive Street 16-inch Water Main Replacement and
<br />Roadway Restoration Project. CM for the improvement of
<br />water system reliability by replacing old 10- and 6-inch cast
<br />iron pipe with new 16-inch ductile iron pipe. The project
<br />also included the replacement of fire hydrants, valves, water
<br />services, and appurtenant structures.
<br />• Lincoln Avenue 16-inch Water Main from Beach Boulevard
<br />to Dale Avenue. Contract administration for $2M project to
<br />construct more than 5,300 LF of 16-, 12-, 10-, 8-, 6- and 4-inch
<br />ductile iron pipe, 12 fire hydrants, and more than 58,500 SF of
<br />asphalt concrete paving.
<br />• Underground Conversion Plan Projects. Contract
<br />administration and CM management for the following projects
<br />as part of the City's Underground Conversion Five -Year Plan
<br />and Wildfire Mitigation Plan. The initiative is relocating overhead
<br />power and communications systems underground and is
<br />intended to improve aesthetics, replace antiquated equipment,
<br />and enhance the reliability of the area's electrical system.
<br />• Rehabilitation of Pressure Regulating Stations (PRS) 30
<br />and 31 and Relocation of PRS-32 and -43 and Construction
<br />of New PRS-73. Contract administration and CM services for
<br />completion of various on -call water utilities projects.
<br />As -Needed Engineering Design Services I Leucadia
<br />Wastewater District
<br />As a prime consultant,
<br />Ardurra provided as -needed
<br />engineering services on a task
<br />order delivery basis to the
<br />Leucadia Wastewater District
<br />staring in 2006. Services
<br />have encompassed a wide
<br />variety of tasks to support
<br />all aspects of the District's
<br />capital and operational needs
<br />including planning and hydraulic
<br />modeling, GIS support services,
<br />flow monitoring, engineering
<br />design, cost estimating, plan
<br />Client Contact
<br />Leucadia Wastewater District
<br />Robin Morishita, Technical
<br />preparation, office engineering
<br />during construction, and construction inspection. The following list
<br />includes highlights of the several task orders Ardurra completed
<br />for the District:
<br />ARDURRn 16 City of Santa Ana Water Resources Division
<br />RFP 22-002 i May 24, 2022
<br />
|