Laserfiche WebLink
improvements followed by <br />sewer lateral program, a multi -year program to consolidate domestic <br />concrete paving of the entire <br />and irrigation delivery system, and program -level specifications to <br />width of the alley. The Pump <br />assist the City with conversion from chlorine gas to onsite chlorine <br />Station #35 project provides for <br />generation for all of the City's water production facilities. <br />upgraded/new dry well and wet <br />well for the pump station. <br />Anaheim Public Utilities Department As -Needed <br />For the ocean Place <br />Engineering I City of Anaheim <br />Development project, Ardurra <br />is providing plan checking and <br />inspection for grading and <br />construction of the road and utility infrastructure that will support <br />Ocean Place, which is a neighborhood of 30 luxury homes in <br />an environmentally sensitive beach front location. Services are <br />focused on the grading and construction of street improvements, <br />storm drains, domestic water and sanitary sewer lines. Of <br />importance will be ensuring the use of stormwater management <br />best practices and compliance with the terms of a California <br />Coastal Commission development permit since the project is in an <br />environmentally sensitive area. The project will include a 6.5-acre <br />public park to be turned over to the City by the developer. Long <br />known by Seal Beach locals as "the DPW Property," the land <br />was once the site of a Los Angeles Department of Public Works <br />steam -generating plant, built in 1925. The plant was shut down in <br />1951 and demolished in 1967. <br />Plan check services have included review of the hydrology and <br />hydraulic analysis, grading plans, street plans, traffic striping <br />and signing, street lighting, signal plans, storm drain plans, utility <br />plans, landscaping and planting, WOMP, sewer and water plans. <br />On -Call Utility Support I City of Huntington Beach <br />Ardurra was awarded an <br />on -call civil engineering, <br />survey, and consulting services <br />contract with the City of <br />Huntington Beach for the next <br />three years for various public <br />works infrastructure projects, <br />including rehabilitation of <br />roads, alleys, curb, gutter, <br />and sidewalks within the <br />public right-of-way, as well as <br />off-street improvements such <br />as rehabilitation of City parking <br />lots. <br />sean.crumby@surfcity-hb.org <br />Year Completed <br />Ongoing since 2021 <br />Consultant Project Manaaer <br />Mark Lewis <br />Utility support has involved staff augmentation for management <br />support, mentoring, as well as program and project development. <br />Projects include development of a 5-year funding strategy <br />for upgrades to stormwater pump station facilities, as well as <br />preparation of project bid specifications for implementation. Other <br />projects include development of on -call specifications for the City's <br />Under an as -needed <br />engineering contract, Ardurra is <br />currently working on or recently <br />completed the following projects <br />for the City of Anaheim: <br />Oak Hills Reservoir <br />Recoating and Upgrades <br />Project. This project involves <br />various improvements at <br />the Oak Hills Reservoir site, <br />including recoating of the <br />reservoir exterior roof and <br />spot repair of coating on <br />the exterior walls; reservoir <br />safet u raaes re airs to <br />Categories <br />1,4 <br />Client Contact <br />City of Anaheim, Public Utilities <br />David Watson, Project <br />Manager <br />310.864.2157 <br />dwatson@anaheim.net <br />Year Completed <br />Ongoing since 2019 <br />Consultant Project Manaoers <br />Rob Weber, Patrick Mulvey <br />y p9 . P <br />the reservoir vents; modifications to the reservoir overflow <br />to meet DDW requirements; modifications to the reservoir <br />cathodic protection system; replacement of the reservoir level <br />sensor; replacement of existing valving and piping on the inlet <br />and outlet pipelines to improve operation of the reservoir and <br />overall water system; installation of new onsite water and <br />sewer connections; and remedjation of ground settlement <br />issues in the northwest corner of the site. The project also <br />includes other tasks at different sites nearby the Oak Hills <br />Reservoir site, such as replacement of the existing electrical <br />cabinet at the Summit Inlet/Outlet Structure; and coating <br />touch-up of the recovery vessel and associated piping and <br />appurtenances at the Lenain Wash Water Recovery Facility. <br />WRDF Present Worth Analysis 2021201.01. The City <br />tasked Ardurra with the responsibility of reviewing the net <br />present value for three alternative directions moving forward <br />regarding the City of Anaheim Water Recycling Demonstration <br />Facility (WRDF). The three alternatives evaluated include: 1) <br />expanding the facility capacity from 50,000 to 100,000 gpm; 2) <br />shutting down and repurposing the facility; and 3) maintaining <br />the facility as is and proceeding with equipment replacement <br />and maintenance as required for operation. Key project <br />components include evaluating costs in the current climate for <br />capital equipment replacement and additions, maintenance, <br />operations, and labor; determining the fiscal, environmental, <br />political, social, and logistical benefits for each option; and <br />utilizing data from research, analysis, and correspondence with <br />the City to provide a full and accurate picture of the current and <br />possible future status of the City's WRDF. <br />City of Santa Ana Water Resources Division ^ <br />RFP 22-002 1 May 24, 2022 [ 15 ] / `� ARDURRA <br />