improvements followed by
<br />sewer lateral program, a multi -year program to consolidate domestic
<br />concrete paving of the entire
<br />and irrigation delivery system, and program -level specifications to
<br />width of the alley. The Pump
<br />assist the City with conversion from chlorine gas to onsite chlorine
<br />Station #35 project provides for
<br />generation for all of the City's water production facilities.
<br />upgraded/new dry well and wet
<br />well for the pump station.
<br />Anaheim Public Utilities Department As -Needed
<br />For the ocean Place
<br />Engineering I City of Anaheim
<br />Development project, Ardurra
<br />is providing plan checking and
<br />inspection for grading and
<br />construction of the road and utility infrastructure that will support
<br />Ocean Place, which is a neighborhood of 30 luxury homes in
<br />an environmentally sensitive beach front location. Services are
<br />focused on the grading and construction of street improvements,
<br />storm drains, domestic water and sanitary sewer lines. Of
<br />importance will be ensuring the use of stormwater management
<br />best practices and compliance with the terms of a California
<br />Coastal Commission development permit since the project is in an
<br />environmentally sensitive area. The project will include a 6.5-acre
<br />public park to be turned over to the City by the developer. Long
<br />known by Seal Beach locals as "the DPW Property," the land
<br />was once the site of a Los Angeles Department of Public Works
<br />steam -generating plant, built in 1925. The plant was shut down in
<br />1951 and demolished in 1967.
<br />Plan check services have included review of the hydrology and
<br />hydraulic analysis, grading plans, street plans, traffic striping
<br />and signing, street lighting, signal plans, storm drain plans, utility
<br />plans, landscaping and planting, WOMP, sewer and water plans.
<br />On -Call Utility Support I City of Huntington Beach
<br />Ardurra was awarded an
<br />on -call civil engineering,
<br />survey, and consulting services
<br />contract with the City of
<br />Huntington Beach for the next
<br />three years for various public
<br />works infrastructure projects,
<br />including rehabilitation of
<br />roads, alleys, curb, gutter,
<br />and sidewalks within the
<br />public right-of-way, as well as
<br />off-street improvements such
<br />as rehabilitation of City parking
<br />lots.
<br />sean.crumby@surfcity-hb.org
<br />Year Completed
<br />Ongoing since 2021
<br />Consultant Project Manaaer
<br />Mark Lewis
<br />Utility support has involved staff augmentation for management
<br />support, mentoring, as well as program and project development.
<br />Projects include development of a 5-year funding strategy
<br />for upgrades to stormwater pump station facilities, as well as
<br />preparation of project bid specifications for implementation. Other
<br />projects include development of on -call specifications for the City's
<br />Under an as -needed
<br />engineering contract, Ardurra is
<br />currently working on or recently
<br />completed the following projects
<br />for the City of Anaheim:
<br />Oak Hills Reservoir
<br />Recoating and Upgrades
<br />Project. This project involves
<br />various improvements at
<br />the Oak Hills Reservoir site,
<br />including recoating of the
<br />reservoir exterior roof and
<br />spot repair of coating on
<br />the exterior walls; reservoir
<br />safet u raaes re airs to
<br />Categories
<br />1,4
<br />Client Contact
<br />City of Anaheim, Public Utilities
<br />David Watson, Project
<br />Manager
<br />310.864.2157
<br />dwatson@anaheim.net
<br />Year Completed
<br />Ongoing since 2019
<br />Consultant Project Manaoers
<br />Rob Weber, Patrick Mulvey
<br />y p9 . P
<br />the reservoir vents; modifications to the reservoir overflow
<br />to meet DDW requirements; modifications to the reservoir
<br />cathodic protection system; replacement of the reservoir level
<br />sensor; replacement of existing valving and piping on the inlet
<br />and outlet pipelines to improve operation of the reservoir and
<br />overall water system; installation of new onsite water and
<br />sewer connections; and remedjation of ground settlement
<br />issues in the northwest corner of the site. The project also
<br />includes other tasks at different sites nearby the Oak Hills
<br />Reservoir site, such as replacement of the existing electrical
<br />cabinet at the Summit Inlet/Outlet Structure; and coating
<br />touch-up of the recovery vessel and associated piping and
<br />appurtenances at the Lenain Wash Water Recovery Facility.
<br />WRDF Present Worth Analysis 2021201.01. The City
<br />tasked Ardurra with the responsibility of reviewing the net
<br />present value for three alternative directions moving forward
<br />regarding the City of Anaheim Water Recycling Demonstration
<br />Facility (WRDF). The three alternatives evaluated include: 1)
<br />expanding the facility capacity from 50,000 to 100,000 gpm; 2)
<br />shutting down and repurposing the facility; and 3) maintaining
<br />the facility as is and proceeding with equipment replacement
<br />and maintenance as required for operation. Key project
<br />components include evaluating costs in the current climate for
<br />capital equipment replacement and additions, maintenance,
<br />operations, and labor; determining the fiscal, environmental,
<br />political, social, and logistical benefits for each option; and
<br />utilizing data from research, analysis, and correspondence with
<br />the City to provide a full and accurate picture of the current and
<br />possible future status of the City's WRDF.
<br />City of Santa Ana Water Resources Division ^
<br />RFP 22-002 1 May 24, 2022 [ 15 ] / `� ARDURRA