My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARDURRA GROUP, INC.
Clerk
>
Contracts / Agreements
>
A
>
ARDURRA GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:56:02 AM
Creation date
9/27/2022 4:34:45 PM
Metadata
Fields
Template:
Contracts
Company Name
ARDURRA GROUP, INC.
Contract #
A-2022-158-02
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
1/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Antonio Avenue Transmission Water Main <br />Ontario Municipal Water Company <br />The Ontario Municipal Water <br />Company owns a 20-MG <br />reservoir (1212-1A) and a <br />2-MG reservoir (1212-1 B), <br />both located at Fern Reservoir <br />Park on 8th Street between <br />Euclid Avenue and San <br />Antonio Avenue in the city of <br />Upland. The reservoirs serve <br />pressure zone (PZ) 1212 via <br />an existing 18-inch-diameter <br />steel pipeline. <br />The project proposes to <br />construct a new 30-inch- <br />diameter pipeline that <br />Categories <br />1,3 <br />Client Contact <br />Ontario Municipal Utilities <br />Company <br />Cynthia Heredia-Tortes, <br />Assistant Engineer <br />909.395.2647 <br />ctorres@ontadoca.gov <br />Year Completed <br />2022 <br />Consultant Project Managers <br />Dolores Salgado <br />connects to the Reservoir 1212.1A outlet and abandon the <br />existing 18-inch-diameter pipeline in place. <br />The project consists of approximately 2,900 linear feet of new <br />30-inch cement mortar lined and coated welded steel pipe <br />(CML&C WSP); and abandonment of approximately 3,700 linear <br />feet of existing 18-inch steel pipe. <br />On -Call Public Works/Capital Improvement Program <br />Irvine Ranch Water District <br />Under an on -call contract, <br />Ardurra provides Irvine Ranch <br />Water District with public works <br />inspection services for new <br />water and sewer main pipeline <br />installations for multiple <br />master -planned communities <br />in the agency's service area. <br />The team is currently <br />inspecting more than 100 <br />water infrastructure projects, <br />in part for development of <br />Irvine's 1,300-acre Great Park <br />master -planned community. <br />Full-time inspectors monitor <br />Categories <br />2 <br />Client Contact <br />Irvine Ranch Water District <br />Kelly Lew, Principal Engineer, <br />Development Inspection <br />Services <br />949.453.5586 <br />Klew@irwd.com <br />Year Completed <br />Ongoing since 2012 <br />Consultant Project Managers <br />OmarAlameddine <br />construction such as the <br />installation of new water mains up to 36 inches in diameter, water <br />service connections, firefighting facilities, potable and recycled <br />water wells, and street resurfacing. Projects have included: <br />• Tustin Legacy Development Domestic Water. Inspected <br />C900 domestic water main lines and appurtenances. <br />Installation of C900 8-inch fire line and fire hydrants. Inspected <br />2-inch to 1-inch copper domestic water services, valve boxes, <br />and risers. <br />• Tustin Legacy Sewer. Inspected installation of SDR 35 sewer <br />mains ranging from 8-inch to 12-inch, plus 4-inch laterals, <br />clean -outs, sewer manholes and manhole covers. <br />• Campus Pavement Rehab (Capital). Inventory and raise to <br />grade existing IRWD utilities including domestic and recycle <br />water boxes, sewer clean -out boxes, and sewer manholes. <br />• Street Improvements (Capital). Inventory and raise to grade <br />existing IRWD utilities including domestic and recycle water <br />boxes, sewer clean -out boxes, and sewer manholes. <br />• Technology Drivel1-5 Freeway Rehab (Capital). Inspected <br />C900 domestic water main lines and appurtenances. <br />Installation of C900 8-inch fire line, plus fire hydrants. <br />Inspected all 2-inch to 1-inch copper domestic water services, <br />all valve boxes, and risers. <br />• Street Rehab and Slurry Seal. Inventory and raise to grade <br />existing IRWD utilities including domestic and recycle water <br />boxes, sewer clean -out boxes, and <br />sewer manholes. <br />• 14430 Myford Road (Capital). <br />Industrial complex raise to grade <br />recycle water valves. <br />• Water Infrastructure <br />Construction, Heritage Fields/ <br />Great Park Development and <br />Orchard Hills Development. <br />Water main construction and <br />installation, domestic water, sewer <br />main construction, and installation. <br />Water Infrastructure <br />Construction, Portola Springs Development. Domestic <br />water main construction and installation. <br />Water Infrastructure Construction, Stonegate Village <br />(multi -neighborhood residential development). Domestic <br />water main construction and installation, sewer main <br />construction, and installation. <br />Water Infrastructure Construction, Enclave 3 Development. <br />Domestic water main construction and installation. <br />On -Call Engineering I South Coast Water District <br />Ardurra has worked on the following projects under its current <br />on -call contract with South Coast Water District: <br />• 30 Acres Site Water and Sewer Facilities. South Coast <br />Water District plans to locate three new portable buildings <br />at the site for District's use as temporary office space. The <br />buildings require new water service, new sewer service, and a <br />new gravity sewer main to connect the site laterals to existing <br />sewer facilities approximately 500 LF south of the building site. <br />The project includes a civil site plan, design of new electrical <br />power service, and communications connection to the District's <br />Groundwater Recover Facility with approximately 2,000 LF of <br />new buried fiber optic. <br />ARDURRA [ 18 ] City of Santa Ana Water Resources Division <br />RFP 22-0021 May 24, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.