My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARDURRA GROUP, INC.
Clerk
>
Contracts / Agreements
>
A
>
ARDURRA GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:56:02 AM
Creation date
9/27/2022 4:34:45 PM
Metadata
Fields
Template:
Contracts
Company Name
ARDURRA GROUP, INC.
Contract #
A-2022-158-02
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
1/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LTM Replacement/ <br />Repair Options at Calle <br />Vista Torito. The LTM is <br />approximately 34,000linear <br />feet (6.5 miles) of pipeline, <br />ranging in size from 24 <br />to 36 inches in diameter, <br />primarily constructed of <br />concrete cylinder pipe <br />(CCP). Due to several <br />recent leaks, the District <br />identified four potential <br />repair, replacement or <br />rehabilitation alternatives. <br />Categories <br />1,3,4 <br />Client Contact <br />South Coast Water District <br />Taryn Kjolsing, Engineering <br />Manager <br />949.342.1154 <br />tKjolsing@scwd.org <br />The protect includes <br />engineering services to evaluate these alternatives with all <br />pertinent factors, develop additional alternatives if feasible, and <br />provide recommendations. <br />Via Sacramento Water Main Improvements. This project <br />involves the replacement of approximately 560 LF of 8-inch <br />ACP with 8-inch PVC pipe, 10 services, 2 fire hydrants, and 1 <br />valve cluster. The existing pipeline is located in the parkway off <br />of Via Sacramento from Camino Capistrano to Via Espinoza in <br />Dana Point. The project includes design, surveying, potholing, <br />and construction phase services. The project also involves <br />developing PS&E for the proposed pipeline replacement. <br />A-2 Lift Station Rehabilitation I Elsinore Valley <br />Municipal Water District <br />Ardurra was chosen by the <br />Elsinore Valley Municipal <br />Water District to provide <br />construction management and <br />inspection services on this lift <br />station rehabilitation project. <br />The project consisted of the <br />rehabilitation of an existing <br />3,600-gpm lift station located <br />within the city of Lake Elsinore. <br />Ardurra provided a construction <br />manager and a site inspector. <br />Our construction manager's <br />res onsibilities included <br />Categories <br />2,4 <br />Client Contact <br />Elsinore Valley Municipal Water <br />District <br />Jason Daffom, Director of <br />Engineering/Water Resources <br />951.434.4708 <br />jdafforn@evmwd.net <br />Year Completed <br />2019 <br />p <br />general contract administration, submittal review, RFI review and <br />processing, coordination with outside agencies and stakeholders, <br />and change order preparation and processing. Our inspector <br />provided day-to-day site inspection, coordination with the District's <br />operation staff, and coordination of special inspection services. <br />In addition to the services provided by Ardurra, our scope involved <br />subconsultants for more specialized inspection services, including <br />Rockwell Construction Services for electrical and SCADA services. <br />Oceanside Staff Augmentation I City of Oceanside <br />Ardurra was chosen by the City <br />as staff augmentation to provide <br />project management and design <br />services to upgrade the City's <br />SCADA system. Responsible <br />for upgrading software and <br />hardware at four treatment <br />plants and over 70 remote sites. <br />Our team managed over50 <br />servers during the conversion <br />process, many of which were <br />virtualized. The work involved <br />replacing over 100 PLCs <br />and replacing two legacy Fix <br />Client Contact <br />City of Oceanside Water Dept. <br />AI Ramirez, SCADA Supervisor <br />760.801.0068 <br />SCADA systems and one standalone Intouch SCADA system and <br />integrated them into one SCADA system running Wonderware <br />System Platform. <br />We designed new network layouts that increased system <br />autonomy and redundancy. We were heavily involved in <br />troubleshooting the new 2.4-GHz radio network connectivity <br />issues. Additionally, we assisted with implementing new WIMs for <br />department wide use. While working at the City, we attended the <br />Water Loss Prevention class and assisted Oceanside staff in data <br />gathering for their annual water loss audit for 2017 and 2018. <br />Various Electrical Engineering Projects* <br />Ardurra is proud to offer <br />the in-house expertise of a <br />California -registered electrical <br />engineer: Agata Ristow. Her <br />experience encompasses <br />design, implementation, and <br />project management of electrical <br />system improvement and SCADA <br />projects for water and wastewater <br />treatment plants across the <br />nation. Agata's resume is <br />attached in Appendix B, but <br />below are a couple highlights of <br />her relevant project experience. <br />• South Holly WTP High <br />S iP St t' M t <br />Client Contact <br />City of Fort Worth Water Dept. <br />Chris Harder. Water Director <br />Christopher.Harder@ <br />FortWorthTexas.gov <br />(Project. South Holly W FP) <br />Year Completed <br />2022 <br />Consultant Project Managers <br />Agata Ristow* (personal <br />experience prior toArdurra) <br />ervce ump a ion o or <br />and Switchgear Replacement and Electrical Improvements, <br />City of Fort Worth.* Provided design for the replacement of <br />medium voltage motor control centers, transformers, 480V <br />motor control centers, instrumentation and control design. <br />Witcher Pump Station, Oklahoma City Water Utilities <br />Trust.* Replacement of the lagoon pumps, electrical gear, <br />and the installation of new emergency generators along with <br />paralleling switchgear at the main pump station. <br />City of Santa Ana Water Resources Division 19 ] /�/ARDURRA <br />RFP 22-002 1 May 24, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.