Laserfiche WebLink
Kyle Bohn, PE <br />PVV and RW Pipeline Replacement/Extension <br />Mr. Bohn is a professional engineer with more than 16 years of <br />experience and he has worked on over 50 miles of pipeline projects. His <br />pipeline experience includes various different pipe materials including <br />those that would be considered for this project such as fusible PCV, <br />PVC, HDPE and epoxy lined ductile iron pipe. Mr. Bohn has been <br />involved in traditional cut and cover pipeline design as well as multiple <br />trenchless projects. His trenchless experience includes the planning, <br />design and construction support of bore and jack, micro -tunneling and <br />horizontal direction drilling. Kyle understands the design constraints, <br />construction staging area needs and risks involved with each type of <br />construction activity. <br />EXPERIENCE <br />Education: <br />BS, Civil Engineering, <br />University of California, Irvine, <br />2006 <br />Registrations/Certifications: <br />Professional Civil Engineer, <br />California, No. 77984, 2011 <br />Office Location: <br />Irvine, CA <br />Years of Experience: <br />16 <br />Years with Tetra Tech: <br />16 <br />City Trunk Line North Unit 2, Los Angeles Department of Water & Power, CA. 2017 - Present. <br />Project Engineer for the design of the City Trunk Line North Unit 2, which will consist of 12,200 linear <br />feet of 54-inch diameter welded steel pipe. The design includes three bore and jack tunnels and <br />3,500 linear feet of slip -lining, where new 54-inch steel pipe will be pushed through an existing 72-inch <br />riveted steel pipeline. The project requires the preparation of plans, specifications, and construction <br />cost estimates. <br />West Chandler Well, South Croddy Well and Pipeline, Mesa Consolidated Water District, CA. <br />2017 - Present. Project Engineer. In order to provide additional local water reliability, Mesa Water <br />purchased two properties within the City of Santa Ana to be used as groundwater well sites. Proposed <br />Well No. 12 is located at 4011 West Chandler Avenue and Proposed Well No. 13 is located at <br />3120 South Croddy Way. Both wells are located outside of Mesa Water's service area and will require <br />the construction of approximately 3,000 feet of pipeline to connect the proposed wells to Mesa Water's <br />existing system. Tetra Tech has been retained by Mesa Water to develop plans and specifications for <br />the construction of Well Nos. 12 and 13 and the pipeline connecting the wells to the existing distribution <br />system. Once operational, Well Nos. 12 and 13 can potentially provide an additional 7 to 9 million <br />gallons per day of safe and reliable drinking water. <br />Alternate Raw Water Transmission Line, Trabuco Canyon Water District, CA. 2016. Project <br />Engineer. project included removal and abandonment of the existing creek crossing and construction of <br />approximately 4,500 linear feet of new 16-inch PVC raw water transmission main. The final pipeline <br />alignment routed the pipe through public walking trails, private property, above ground over a 144-inch <br />shallow storm drain crossing, through city streets, and across a bridge, and required coordination with <br />Orange County Parks, private property owners, Orange County Flood Control District, City of Lake <br />Forest, FEMA, and the California Department of Fish and Wild Life. <br />Carlsbad Seawater Desalination Conveyance Pipeline, KSD Joint Venture, Carlsbad, CA. 2015. <br />Design Engineer for the Carlsbad Conveyance Pipeline Design -Build Project. The project was designed <br />for the Kiewit Shea Desalination Joint Venture team and consists of approximately 10 miles of 54-inch <br />welded steel pipe. The pipeline was installed in existing city streets and right-of-way through the cities <br />of Carlsbad, Vista and San Marcos. Large diameter tunnels were used to cross a major commuter rail <br />line, an Interstate Highway, and protected wetlands at the entrance to a seawater lagoon. The 54-inch <br />transmission main is sized for 54 MGD of desalinated seawater. Pressures range from 250 psi at the <br />point of connection to 500 psi at the seawater desalination plant. <br />TETRA TECH <br />