Mike Tsoi, PE Education
<br />Pump/Lift Station Upgrades BS,CrsityofCaliorni
<br />University of California. Irvine,
<br />Mr. Tsoi has more than 32 years of professional experience in water, 1991
<br />wastewater, and recycled water engineering. Mike has been RegistrationslCertifications:
<br />responsible for the planning and design of water, wastewater, and Professional Civil Engineer,
<br />recycled water pipelines along with pump stations, flow control facilities, California, No. 53715, 1994
<br />reservoirs and site improvements. Over the span of his career, Mr. Tsoi Professional Affiliations:
<br />has designed more than 15 wells, 20 pump stations, and 300,000 feet American Society of Civil
<br />of pipeline. Engineers
<br />EXPERIENCE Office Location:
<br />Fleming Zone 8 Tank and Zone 8 to 9 Booster Pump Station Irvine, CA
<br />Demolition and Replacement, Irvine Ranch Water District, Irvine, Years of Experience:
<br />CA. 2019 - Present. Deputy Project Manager. Engineering design 32
<br />services for demolition and replacement of an existing above ground Years with Tetra Tech:
<br />0.15 MG Zone 8 steel tank and Zone 8 to 9 pump station consisting of 32
<br />two 600 gpm vertical turbine pumps each equipped with a
<br />60 horsepower motor. The Fleming pump station site also contains an existing administrative building
<br />with a conference room and restroom, two storage buildings, and an AT&T cellular antenna facility.
<br />Services also include storage building replacement; reservoir management system building with sodium
<br />hypochlorite and aqueous ammonia storage and feed systems and an "in -tank" chemical injection and
<br />mixing system; a 2,000 gallon diesel fuel storage tank and dispensing system; and site electrical
<br />service, controls, and telemetry improvements.
<br />Well No. 28 and Public Mini Park, City of Orange, CA. 2019 - Present. Lead Project Engineer for
<br />engineering design services for proposed new Well No. 28 and Public Mini Park. Services include
<br />drilling and equipping of Well No. 28, a new potable water well (980 feet deep). The project involved
<br />installation of a CMU block control building and sodium hypochlorite building, 12.5% sodium
<br />hypochlorite disinfection facility, sound enclosure around the well head, site and landscaping
<br />improvements, and public mini park.
<br />Mid -Basin Injection: Centennial Park Design Services, Orange County Water District, Santa Ana,
<br />CA. 2020. Project Engineer responsible for the design of four injection wells to be located within
<br />Centennial Park in the City of Santa Ana for Orange County Water District. In addition to the
<br />engineering services for the four injection wells, the project includes the design of the supply pipeline,
<br />backflush pipeline, bridge crossing, two shared facility sites, a monitoring well site, site improvements,
<br />and paving of park access roads and parking lots.
<br />Dyer Road Well Field Surge Tank and Construction Support, Irvine Ranch Water District, Irvine,
<br />CA. 2020. Lead Project Engineer. Preliminary design and final design phase services for the design of
<br />a new 603 cubic foot surge tank at Well 5; the design of a new 1,206 cubic foot surge tank at Well 7;
<br />the design of a larger 3,454 cubic foot surge tank at Well 11 to replace the existing 2,985 cubic foot
<br />tank; and the design of a larger 1,570 cubic foot surge tank at Well 15 to replace the existing 1,400
<br />cubic foot tank. Each site includes an air compressor, piping, valves and other appurtenances.
<br />Peters Canyon Channel Water Capture and Reuse Pipeline, Irvine Ranch Water District, Irvine,
<br />CA. 2016. Project Engineer for over 17,000 linear feet of 10-inch to 16-inch steel and PVC
<br />pipeline. This was a joint project with the City of Irvine, City of Tustin, County of Orange, and Caltrans.
<br />Project included three storm drain diversion structures and intake design, hanging the pipeline from two
<br />bridges, bore and jack under the railroad and backpressure vault.
<br />Well No. 27 Equipping Plan, City of Orange, CA. 2016. Project Engineer for the preparation of the
<br />plans, specifications and cost estimate for the equipping of a potable water well. As part of the well
<br />equipping a generator room was installed for backup power.