Laserfiche WebLink
Erin Cabanero, PE Education: <br />BS, Civil Engineering, <br />Pump/Lift Station Upgrades University ofCalifornia, Irvine, <br />Ms. Cabanero has provided design engineering in various water and <br />2009 <br />wastewater projects including domestic and reclaimed water pipelines, <br />Registrations/Certifications: <br />water main replacements, gravity sewer mains, pump stations, lift <br />Professional Civil Engineer, <br />stations, reinforced concrete reservoirs, steel tank reservoirs, wells, flow <br />California, No. C 89704, 2018 <br />control facilities, and pressure reducing valve vaults. Responsibilities <br />Professional Affiliations: <br />have included preparation of construction plans, specifications, and <br />American society of civil <br />design calculations; assisted supervisors in preparing project reports <br />Engineers <br />and memorandums and project schedules. <br />office Location: <br />EXPERIENCE <br />Irvine, CA <br />Fleming Zone 8 Tank and Zone 8 to 9 Booster Pump Station Years of Experience: <br />Demolition and Replacement, Irvine Ranch Water District, Irvine, 13 <br />CA. 2019 - Present. Design Engineer. Engineering design services for Years with Tetra Tech: <br />demolition and replacement of an existing above ground 0.15 MG Zone 13 <br />8 steel tank and Zone 8 to 9 pump station consisting of two 600 gpm <br />vertical turbine pumps each equipped with a 60 horsepower motor. The Fleming pump station site also <br />contains an existing administrative building with a conference room and restroom, two storage <br />buildings, and an AT&T cellular antenna facility. Services also include storage building replacement; <br />reservoir management system building with sodium hypochlorite and aqueous ammonia storage and <br />feed systems and an "in -tank" chemical injection and mixing system; a 2,000 gallon diesel fuel storage <br />tank and dispensing system; and site electrical service, controls, and telemetry improvements. <br />Well No. 32 Rehabilitation, City of Santa Ana, CA. 2017 - Present. Design Engineer. Provided <br />engineering planning and design to assist with the rehabilitation of Well 32. The project includes the <br />construction of new CMI I block well building and sodium hypochlorite building, sodium hypochlorite <br />disinfection facility, approximately 3,300 linear feet of 16-inch pipe from Well 32 to John Garthe <br />Reservoir, bore and jack under channel crossing, and site improvements. <br />Mid -Basin Injection: Centennial Park Design Services, Orange County Water District, Santa Ana, <br />CA. 2020. Design Engineer for four injection wells to be located within Centennial Park in the City of <br />Santa Ana for Orange County Water District. In addition to the engineering services for the four <br />injection wells, the project includes the design of the supply pipeline, backflush pipeline, bridge <br />crossing, two shared facility sites, a monitoring well site, site improvements, and paving of park access <br />roads and parking lots. <br />Elizabeth Reservoir, Booster Pump Station and New Well No. 29, City of South Gate, CA. 2019. <br />Design Engineer for the design and construction support for the drilling and equipping of a new <br />2,500 gpm well, sodium hypochlorite facilities, and generator at the well site and a 1.8 steel reservoir, <br />booster pump station consisting of three 125 hp pumps/motors at the reservoir site, and about <br />5,000 feet of water main replacements within the City of South Gate. The project combined the well <br />drilling and well equipping phases of the work together. <br />Burris Pump Station, Orange County Water District, Anaheim, CA. 2018. Design Engineer for the <br />design of the new Burris Pump Station which consists of four 1,750 horsepower vertical turbine pumps <br />delivering a maximum flow rate of 200 cfs to the Santiago Basins from Burris Basin. Work consisted of <br />reviewing the existing Burris Pump Station Evaluation Report, assisting OCWD with selecting a <br />replacement option, performing final design of the selected option and providing bid and construction <br />phase services. The project also included unique designs: 190,000 cubic yards of earthwork to be <br />completed prior to pump station construction, the construction of a 55-foot diameter by 55-foot high <br />circular wet well which was computer and physically modeled during design for flow characteristics, and <br />the construction of a 180,000 gallon surge suppression system. <br />TETRA TECH <br />