Laserfiche WebLink
- <br />Amanda Taylor,PE I Education <br />WallerQuality/Disinfection Engineering ndtal Science, <br />Ms. Taylor is experienced in analysis and process design of various <br />Johns Hopkins University, <br />Baltimore, MD, 2011 <br />municipal and industrial water/wastewater projects. Amanda has <br />BS, Biological Systems <br />experience with traditional and advanced water and wastewater <br />Engineering, Virginia <br />projects, including Title 22, Microfiltration, Ultrafiltration, Reverse <br />Polytechnic Institute and <br />Osmosis, and UV Treatment. <br />State University, Blacksburg, <br />VA. zoos <br />EXPERIENCE <br />Registrations/Certifications; <br />PFAS On -Call Contract, Orange County Water District, CA. <br />Professional Chemical <br />2021 - Ongoing. Process Engineer for IX/GAC treatment for PFOS and <br />Engineer, California, <br />PFOA design for 18 affected wells in the Main Orange County Basin. <br />No. 6700, 2015 <br />Project included design, estimating of capital and operating costs, <br />Virginia Board for Architects, <br />coordinating with vessel suppliers, and construction management for <br />Professional Engineers, Land <br />the following projects: <br />Surveyors, Certified Interior <br />Designers, and Landscape <br />• Serrano Water District — 4.3 MGD Treatment for 2 wells <br />Architects, Virginia, <br />• Yorba Linda Water District — 25.0 MGD Treatment for 10 wells <br />No. 0402050760, 2013 <br />• Fullerton Kim 1A — 4.0 MGD Treatment for 1 well <br />Office Location: <br />• Fullerton Main Plant —12.0 MGD for 5 wells <br />Irvine, CA <br />Pure Water Oceanside, Conveyance and Injection Facilities, City of Years of Experience: <br />Oceanside, CA. 2019 - Ongoing. Process Engineer. As part of the Pure 13 <br />Water Oceanside project Tetra Tech designed the pipelines that will be Years with Tetra Tech: <br />constructed as part of the Advanced Water Purification Facility (AWPF) 5 <br />that convey the advanced treated water to the existing Lower Recycled <br />Water Pump Station and to the Upper Recycled Water Pump Station <br />that will be built along with the AWPF. In addition, Tetra Tech designed three new injection wells (Well <br />1, Well 3 and Well 6) and conveyance pipelines to the wells, totaling a maximum capacity of 6.0 MGD. <br />Carlsbad Desalination Intake Pump Station, Design of a 300 MGD Dilution Pump Station, <br />Phase 1, Kiewit Infrastructure West, Carlsbad, CA. 2019 - Ongoing. Process Engineer. This <br />design -build project provides for the design and construction of brine dilution pumps at the existing <br />Carlsbad Desalination Plant (CDP) with minimal production shutdown. The project consists of hydraulic <br />pump modeling and design of dilution pumps, discharge piping, brine piping, and flowmeter facilities, <br />NRG forebay modifications including new screen backwash pumps and tunnel bulkheads, a new <br />electrical building, and the associated civil and grading work. The project has extensive structural <br />rehabilitation work and a new floating dock in the lagoon. The project provides instrumentation and <br />controls for the operation of the new facility and will tie in new signals to the existing CDP control <br />system. The project has many environmental factors and requires working closely with local permitting <br />agencies, the City, the CDP operators, and the Encina Power Station. <br />San Jacinto Valley Water Banking Project, Enhanced Recharge and Recovery Program Phase 1 <br />Well Equipping and Treatment Facilities Preliminary Design, Eastern Municipal Water District, <br />San Jacinto, CA. 2019 - Ongoing. Process Engineer responsible for the process design of a new <br />8.64 MGD centralized treatment plant based on the recommendations offered during the preliminary <br />design report prepared for the District under a separate task order. The central groundwater treatment <br />plant includes greensand plus pressure filters for iron and manganese removal and disinfection and the <br />option to expand to four double -the -flow capacity to the iron and manganese removal equipment and <br />triple the flow to the disinfection system. The process design includes greensand plus pressure filter <br />systems, a backwash reclaim system, and bulk sodium hypochlorite storage and dosing facilities. <br />TETRA TECH <br />