Laserfiche WebLink
Victor Ramirez PE SE <br />f � Educaa <br />tCivion: <br />neeri <br />Building Rehab & Struct, Seismic Architecture California StateUniersity, <br />Mr. Ramirez has more than 40 years of structural engineering design <br />Los Angeles, 1995 <br />experience with special emphasis in the design of water storage/water <br />Registrations/Certifications: <br />containment and water conveyance related structures. His experience <br />Professional Civil Engineer, <br />includes reservoirs, water/wastewater treatment plants, booster pump <br />California, No. 56863, 1997 <br />stations, flow control facilities, pressure reducing stations and pipelines. <br />Professional Structural <br />Mr. Ramirez is thoroughly knowledgeable in all types of construction, <br />Engineer, California, <br />including reinforced concrete, masonry, structural steel, and timber. <br />No. 4720,2004 <br />EXPERIENCE <br />Professional Affiliations: <br />American Institute of Steel <br />Well Equipping & Treatment at Well No. 16, City of Paramount, CA. <br />Construction <br />2016 - Ongoing. Structural Engineer. The City of Paramount has drilled <br />Structural Engineers <br />a new 18" diameter well (Well No. 16) to increase flow into the potable <br />Association of Southern <br />water system. Based on water quality data collected during drilling the <br />California <br />newly drilled Well No. 16 will require treatment to filter out the naturally <br />Office Location: <br />occurring arsenic, manganese, and iron. Additionally, the City was to <br />San Dimas, CA <br />decommission existing Well No. 13 and relocate a portion of the existing <br />years of Experience: <br />treatment system to the new Well No. 16 site. <br />40 <br />Seismic Resiliency of 8 Reservoirs, Montecito Water District, Years with Tetra Tech: <br />Montecito, CA. 2021. Structural Project Engineering assisting with the 40 <br />Final Design documents for Bella Vista, Cold Spring, Hot Springs, <br />Buena Vista, Doulton , Romero, Terminal and Park Lane. Tetra Tech <br />prepared Structural and Seismic Evaluation of District Storage Reservoirs dated 9/2015 and used that <br />report to prepare final design documents. <br />MF Filtrate Tank Assessment, Leo Vander Lans Advanced Water Treatment Facility Water <br />Replenishment District of Southern California, Pico Rivera, CA. 2019. Structural Project Manager <br />for the condition assessment of the existing 35,000-gallon capacity, welded steel, microfiltration filtrate <br />tank at the Leo Vander Lans Advanced Water Treatment Facility, Long Beach, CA. The microfiltration <br />filtrate tank is founded on and anchored to a concrete foundation. The Tetra Tech team provided field <br />investigation, condition assessment report, and recommendations. <br />Hunting Horn Reservoir Evaluation, Golden State Water Company, North Tustin, CA. 2019. <br />QA/QC Structural Manager for the structural and seismic evaluation and study of Hunting Horn <br />Reservoir, a partially buried, cylindrical, reinforced concrete tank with a wood framed roof. The tank has <br />a capacity of 0.44 MG and is about 72 feet in diameter by 16 feet deep. It has a flat concrete floor, <br />concrete masonry walls, and a wood framed roof. <br />Conveyance Pipeline for Carlsbad 50 MGD Seawater Desalination Plant, Poseidon Resources <br />Corporation, Carlsbad, CA. 2013. Structural Engineering. Manager for the design of two piping and <br />control buildings and four buried concrete vaults six structures associated with the interconnection of <br />the new 54-inch diameter Carlsbad Conveyance Pipeline with the existing SDCWA P3 and P4 <br />pipelines. The six structures are buried reinforced concrete vaults that consist of two pump wells, two <br />isolation valve vaults, an interconnect valve vault and a flow control facility. The flow control facility vault <br />has an above -grade concrete masonry control room with a steel framed roof built on top of it. The <br />buildings are concrete masonry structures with steel framed roofs. <br />John Garthe Reservoirs, City of Santa Ana, CA. 2002. Structural Project Manager. Structural design <br />of a ring beam which supports a 973,000 square foot reservoir floating cover, a reinforced concrete <br />chemical containment area with a structural steel canopy and several foundations for process <br />equipment and tanks. <br />TETRA TECH <br />