Eric Yuen, PE, SE Education: 1
<br />Building Rehab & Struct. Seismic Architecture CalifonliaSa'tePolytechnic
<br />Mr. Yuen has more than 15 years of experience in the design, analysis
<br />University, Pomona, 2007
<br />and detailing in structural engineering. Mr. Yuen is knowledgeable in
<br />MS, Structural Engineering,
<br />California State Polytechnic
<br />reinforced concrete, masonry, structural steel and wood frame design,
<br />University, Pomona, 2016
<br />and construction for a variety of building and infrastructure projects
<br />including reservoirs, water/wastewater treatment facilities, as well as
<br />Registrations/Certifications:
<br />seismic retrofit of existing structures.
<br />Professional Civil Engineer,
<br />California, No. 75983, 2009
<br />EXPERIENCE
<br />Professional Structural
<br />Timber Ridge Booster Pump Station Replacement, Yorba Linda
<br />Engineer, California,
<br />No. 6177, 2014
<br />Water District, Placentia, CA. 2020 - Present. Structural Project
<br />Manager. Project includes engineering planning, design and
<br />Professional Affiliations:
<br />construction -phase services for the replacement of an existing 35-year
<br />American Institute of steel
<br />old booster pump station. Tetra Tech to design and construct a new
<br />N Construction
<br />^
<br />CMU block pump station building; replace the existing gas engine pump
<br />office Location:
<br />and enclosure with a new electric driven pump/motor with the same or
<br />San Dimas, CA
<br />greater rated capacity; install an emergency natural gas engine driven
<br />Years of Experience:
<br />generator set; install two bladder tanks for surge protection for the
<br />15
<br />1000 Zone and 1300 Zone; replace existing direct buried mag meters
<br />on the 1300 Zone and 1160 Zone discharge piping with above ground
<br />Years with Tetra Tech:
<br />meters; and replace and upgrade the existing electrical equipment.
<br />15
<br />Pure Water Oceanside, Advanced Water Purification Facility, City
<br />of Oceanside, CA. 2018 - Ongoing. Structural Engineer. To counteract the growing reliance on
<br />imported water supply while increasing local water supplies, and to meet the City's long-term goal of
<br />50% water independence by 2030, the City has selected a team led by Tetra Tech to design a new
<br />Advanced Water Purification Facility (AWPF). The newly proposed AWPF will provide highly -treated
<br />water supply with the specific purpose to recharge the MGB in the upper San Luis Rey recycled water
<br />service area through indirect potable reuse as a component of the overall Pure Water Oceanside
<br />project. The AWPF will be built on an existing former recycled water storage pond at the San Luis Rey
<br />Water Reclamation Facility. The AWPF process will be designed as a multi -barrier treatment process
<br />including microfiltration, reverse osmosis, and ultraviolet advanced oxidation process. In addition to
<br />these three main unit treatment processes, the AWPF will include chemical storage and feed
<br />equipment for conditioning, stabilizing and membrane cleaning. The facilities design also includes
<br />influent flow storage, flow diversion, and associated pumping.
<br />Albert Robles Center for Water Recycling and Environmental Learning (Formerly known as
<br />GRIP), Water Replenishment District of Southern California, Pico Rivera, CA. 2019. Structural
<br />Engineer for a new 13,000 acre-feet per year of fully advanced treated recycled water. The structures
<br />include a two-story administration building with a rooftop garden, a 45,000 square foot process building,
<br />a 3 MG buried concrete equalization tank, and a dozen ancillary structures. The administration building
<br />has rigid floor and roof diaphragms with concentric steel braced frames as the lateral force resisting
<br />elements. The process building has a steel framed roof and concrete masonry shear walls. An
<br />extensive network of cable trays and piping are supported from the roof for gravity and seismic loads.
<br />Conveyance Pipeline for Carlsbad 50 MGD Seawater Desalination Plant, KSD Joint Venture,
<br />Carlsbad, CA. 2014. Structural Design Engineer. Assisted with the design of several structures
<br />associated with the interconnection of the new 54-inch diameter Carlsbad Conveyance Pipeline with
<br />the existing SDCWA P3 and P4 pipelines. The four structures are buried reinforced concrete vaults that
<br />consist of two pump wells, two isolation valve vaults, an interconnect valve vault and a flow control
<br />facility. The flow control facility vault has an above -grade concrete masonry control room, with a steel
<br />framed roof built on top of the structure.
<br />TETRA TECH
<br />
|