My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (7)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 3:46:03 PM
Creation date
10/4/2022 11:01:40 AM
Metadata
Fields
Template:
Contracts
Company Name
-TETRA TECH, INC.
Contract #
A-2022-158-01
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
10/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mazen Kassar, PE <br />Electrical & Controls <br />Mr. Kassar has more than 29 years of experience in electrical <br />engineering and industry standard that include electrical engineering <br />staff management, project management, construction management and <br />supervision, water and wastewater treatment, petro-chemical design, <br />and environmental soil and groundwater treatment. Mazen's <br />background includes designing medium and low voltage power <br />distribution, designing instrumentation, control systems and SCADA <br />systems for a wide -variety of projects, and the installation of electrical <br />systems for remediation projects, including soil vapor extraction <br />systems and groundwater pump -and -treat systems. <br />EXPERIENCE <br />Education: <br />BS, Electrical Engineering, <br />California State University, <br />Long Beach,1990 <br />Reg istrations/Certifications: <br />Professional Electrical <br />Engineer, California, <br />No. 15809, 1998 <br />General Construction, <br />Class B, California, <br />No. 777845, 2008 <br />Professional Affiliations: <br />Institute of Electrical and <br />Electronics Engineers <br />Office Location: <br />Timber Ridge Booster Pump Station Replacement, Yorba Linda Irvine, CA <br />Water District, Placentia, CA. 2020 - Present. Electrical Project Years of Experience: <br />Manager. Project includes engineering planning, design and 29 <br />construction -phase services for the replacement of an existing 35-year <br />old booster pump station. The District contracted Tetra Tech to design Years with Tetra Tech: <br />and construct a new CMU block pump station building; replace the 12 <br />existing gas engine pump and enclosure with a new electric driven <br />pump/motor with the same or greater rated capacity; install an emergency natural gas engine driven <br />generator set; install two bladder tanks for surge protection for the 1000 Zone and 1300 Zone; replace <br />existing direct buried mag meters on the 1300 Zone and 1160 Zone discharge piping with above <br />ground meters; and replace and upgrade the existing electrical equipment. <br />Fleming Zone 8 Tank and Zone 8 to 9 Booster Pump Station Demolition and Replacement, <br />Irvine Ranch Water District, Irvine, CA. 2019 - Present. Electrical Project Manager. Engineering <br />design services for demolition and replacement of an existing above ground 0.15 MG Zone 8 steel <br />tank and Zone 8 to 9 pump station consisting of two 600 gpm vertical turbine pumps each equipped <br />with a 60 horsepower motor. The Fleming pump station site also contains an existing administrative <br />building with a conference room and restroom, two storage buildings, and an AT&T cellular antenna <br />facility. Services also include storage building replacement; reservoir management system building <br />with sodium hypochlorite and aqueous ammonia storage and feed systems and an "in -tank" chemical <br />injection and mixing system; a 2,000 gallon diesel fuel storage tank and dispensing system; and site <br />electrical service, controls, and telemetry improvements. <br />Well No. 32 Rehabilitation, City of Santa Ana, CA. 2017 - Present. Electrical Project Manager. The <br />project involved the preparation of a PDR and plans/specifications for the rehabilitation of the well <br />facility. The underground well would be scraped, cleaned and modified to be within an above ground <br />CMU block control building (housing mechanical and electrical rooms). The design also included a <br />separate on -site generation sodium hypochlorite building, 3,500 feet of 12-inch discharge pipe to John <br />Garthe Reservoir and modification at the reservoir to connect to the on -site piping. <br />Santiago Pump Station Modification, Orange County Water District, Fountain Valley, CA. 2022. <br />Electrical Project Manager. Provided engineering planning, design and construction -phase services for <br />modifications to the existing Santiago Basin Floating Pump Station installed within the existing <br />Santiago Recharge Basin. Services included replacement of the existing two large pump drives with <br />VFDs and constructed additional necessary modifications that would allow the pumps to function <br />between a water elevation of 285-feet and 240-feet. <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.