Laserfiche WebLink
Molly Lovegren, PE Education: <br />S, Civil Environmental <br />Construction Support Services Engneerng,University of <br />Ms. Lovegren has provided design engineering in various water and <br />California, Los Angeles, 2005 <br />wastewater projects including domestic and reclaimed water pipelines, <br />Registrations/Certifications: <br />water main replacements, gravity sewer mains, pump stations, lift <br />Professional Civil Engineer, <br />I <br />stations, reinforced concrete reservoirs, flow control facilities, and <br />California, No. 73957, 2009 <br />pressure reducing valve vaults. Responsibilities have included: <br />Professional Affiliations: <br />preparation of construction plans, specifications, design calculations, <br />American Society of Civil <br />and project memorandums. <br />Engineers <br />EXPERIENCE Office Location: <br />San Jacinto Valley Water Banking Project -Enhanced Recharge Irvine, CA <br />and Recovery Program, Phase 1A Pipelines Final Design, Eastern Years of Experience: <br />Municipal Water District, San Jacinto, CA. 2022. Pipeline Project 18 <br />Engineer. Final design for approximately 4,700 linear feet of 18-inch and Years with Tetra Tech: <br />12-inch PVC raw water pipelines from four well sites. Work included 18 <br />survey, geotechnical investigation, final plans, specifications, and cost <br />estimate. <br />Central Water Integration Pipeline, San Antonio Water System, San Antonio, TX. 2020. Project <br />Engineer. The San Antonio Water System entered into a contract with Vista Ridge LLC (Project <br />Company) to provide 50,000 acre-feet per year of Carrizo/Simsboro Aquifer groundwater. Work <br />covered four pipeline segments: Segment 5-1 (10,300 LF of 54-inch CML and C steel pipe); Segment <br />5-2 (4,100 LF of 36-inch CML and polyurethane coated steel pipe); Segment 5-3 (1,800 LF of 48-inch <br />CML and polyurethane coated steel pipe); and Segment 5-4 (5,000 LF of 30-inch and high -density <br />polyethylene pipe and 24-inch ductile iron pipe). <br />Emergency Technical Support Services, Montecito Water District, Montecito, CA. 2018. Project <br />Engineer. An intense precipitation event triggered mudslides throughout the City of Montecito. The <br />Montecito Water District's infrastructure was significantly impacted. The District commenced <br />emergency operations with the primary objective to rapidly make repairs to the District's water supply <br />and delivery system. Priorities were established, damage assessments conducted, and repair work <br />commenced. Tetra Tech assisted the District with Priority 1, the repair of the Highline that connects the <br />District from the west to east and allows the District to feed their higher elevation water reservoirs. The <br />Highline was constructed in the early 1940s and is a 14-inch diameter welded steel pipe. The damage <br />to the Highline occurred at six creek crossings: Cold Springs, Hot Springs, San Ysidro, Buena Vista, <br />Bella Vista, and Romero. The District requested Tetra Tech to devise repairs that could be constructed <br />within seven days with materials that were available. <br />1-8 Crossing at Viewside Lane, Padre Dam Municipal Water District, Santee, CA. 2017. Design <br />Engineer. Provided construction plans, specifications, and construction support services for the <br />replacement of an existing 8-inch water main crossing Interstate 8 Freeway at Viewside Lane near <br />Alpine, California. Warner Industrial Park Waterline Replacement, City of Santa Ana, CA. 2015. Project <br />Engineer. The project included preparation of construction drawings and specifications for the Warner <br />Industrial Park Water and Sewer Main Improvements Project. The project consisted of designing <br />approximately 8,200 linear feet of new 8-inch PVC water main. <br />Warner Industrial Park Sewer Replacement, City of Santa Ana, CA. 2015. Design Engineer. The <br />project consisted of the replacement of approximately 2,000 linear feet of the existing sewer line on <br />Susan Avenue between Warner Avenue and Segerstrom Avenue. <br />Westminster Avenue Sewer Main Improvements, City of Santa Ana, CA. 2013. Design Engineer. <br />Oversaw approximately 3,300 linear feet of 15-inch VCP sewer main to increased capacity in the City's <br />sewer system. <br />TETRA TECH <br />