Laserfiche WebLink
Cory Heggtveit, EIT Education: <br />FS <br />BS, Civil Engineering, <br />Re lro�� <br />l It <br />California State University, <br />Mr. Heggtveit has provided design engineering in various water and <br />Long Beach, 2009 <br />wastewater projects including domestic and reclaimed water pipelines, <br />Registrations/Certifications: <br />water main replacements, gravity sewer mains, pump stations, lift <br />Engineer in Training, <br />stations, reinforced concrete reservoirs, flow control facilities, recycled <br />California, No. 121854, 2005 <br />water customer conversions, and pressure reducing valve vaults. Cory's <br />office Location: <br />responsibilities have included preparation of construction plans, <br />Irvine, CA <br />specifications, design calculations and project memorandums. <br />Years of Experience: <br />EXPERIENCE <br />za <br />Los Angeles Stadium and Entertainment District Recycled Water L20 <br />ars with Tetra Tech: <br />Project, West Basin Municipal Water District, Inglewood, CA. 2018 - Ongoing. Project Coordinator. Tetra Tech provided technical <br />support and assistance to the developers of a 298-acre multi -use site <br />that will be the home of the Los Angeles Stadium and other sports and entertainment venues. It will <br />include space for commercial office, residential, shopping, restaurants and parks. Tetra Tech assisted <br />the developer with on -site irrigation plans so they meet Los Angeles County Department of Public <br />Health, West Basin, and other regulatory requirements. <br />Palos Verdes Golf Course Recycled Water Retrofit, West Basin Municipal Water District, Carson, <br />CA. 2020. Project Coordinator. Prepared regulatory drawings for conversion of the 100-acre Palos <br />Verdes Golf Course to use Title 22 Recycled Water. Assisted the District with meeting with State and <br />Los Angeles County Departments of Public Health to explain the project and request approval for the <br />use of recycled water to refill the golf courses existing irrigation impoundment (lake). <br />Dominguez Technology Center Recycled Water Retrofit Project, West Basin Municipal Water <br />District, Carson, CA. 2019. Project Coordinator. Assisted the Water District with the conversion of <br />300 Acre Dominguez Technology Centers (Commercial Center) irrigation systems to use Title 22 <br />Recycled Water. Services provided included preparation of regulatory drawings, permitting assistance, <br />regulatory assistance and coordination, Hydraulic analysis of District's recycled water distribution <br />system and pump station, Engineering support during construction, startup assistance of the recycled <br />water pump station, and cross connection testing support with State and County Departments of Public <br />Health. <br />Torrance Unified School District Recycled Water Conversions, West Basin Municipal Water <br />District, Carson, CA. 2017. Design Engineer. The Torrance Unified School District prepared plans to <br />construction classroom modernizations and recycled water irrigation system upgrades for three of their <br />existing schools which required approval from the Los Angeles County Department of Public Health. <br />Tetra Tech developed supplemental overall site plans for each school to assist the District with <br />obtaining approval from the Los Angeles County Department of Public. <br />Sepulveda Boulevard Parkway Project, West Basin Municipal Water District, Carson, CA. 2017. <br />Design Engineer. Updated sites plans for an existing recycled water irrigation site, and assisted the <br />District with obtaining approval from the Los Angeles County Department of Public Health for the <br />Sepulveda Boulevard Parkway Recycled Water Project. <br />Aliso Village Shopping Center Recycled Water Retrofit, Moulton Niguel Water District, Aliso <br />Viejo, CA. 2015. Project Coordinator for the design of the Aliso Village Shopping Center Recycled <br />Water Retrofit including preparation of the plans and specifications, potholing of existing recycled water <br />pipeline, preparation of legal description and sketch, and permitting with the County of Orange. <br />TETRA TECH <br />