Laserfiche WebLink
Paula Fell Education: <br />M <br />cnV�roni�ental S, Environmental <br />Sciences, California State <br />Ms. Fell has more than 27 years of experience preparing environmental <br />University, 1993 <br />documentation and more than 23 years in a senior management role. <br />BA, Biological Sciences, <br />Kansas state university, <br />Paula has prepared and managed California Environmental Quality <br />1981 <br />Act/National Environmental Policy Act (CEQA/NEPA) documents <br />including Initial Studies (ISs), Mitigated Negative Declarations (MNDs), <br />Environmental Impact Report (EIRs), Environmental Assessments <br />Association <br />Association of Environmental <br />Professionals Workshops <br />(EAs), and Environmental Impact Statements (EISs), for projects <br />throughout California on behalf of federal, state, regional, and local <br />office Location: <br />agencies and private clients. Paula's expertise also includes data <br />Irvine, CA <br />collection and analysis on environmental issues such as visual <br />Years of Experience: <br />resources, land use, public services, biological resources, <br />27 <br />socioeconomics, recreation, and utilities. <br />Years with Tetra Tech: <br />EXPERIENCE s <br />Washington Avenue Lot Well and Facility, Initial Study/Mitigated --=— <br />Negative Declaration, City of Santa Ana, CA. 2020 - Present. Project Manager. Managing the <br />preparation of an Initial Study/Mitigated Negative Declaration for the development of a new water well, <br />well building, chemical building, and other supporting facilities on a currently vacant lot in Santa Ana. <br />SA-1 Hydro -Generator Replacement, City of Santa Ana, CA. 2020 - Present. Environmental. <br />Engineering design services for replacement of a 33-year old turbine generator. Services include <br />removing the existing turbine/generator and installing a new unit and connecting to the electrical and <br />control systems, upgrading the ventilation system, new RTU control panel, coordination with Enterprise <br />Automation, and replacement of the existing switchboard and MCC. The demolition of the existing unit <br />will include the removal of the generator, turbine shaft, impellers and upper housing. Replacement will <br />include new construction involving, new motorized valve upstream of the new turbine/generator, new <br />manual valve downstream, new ball valve with motorized flow controller, and new PRV valve (in <br />series). <br />Water Wells No.12 and No. 14 and Pipeline, Construction Mitigation Support, Mesa Water <br />District, Costa Mesa, CA. 2020 - Present. Project Manager. Managing implementation of cultural <br />resources mitigation measures for the construction of two new water wells and associated pipelines. <br />Crown Valley Pipeline Replacements, Moulton Niguel Water District, Aliso Viejo, CA. <br />2020 - Present. Project Manager. Managing the preparation of an Initial Study/Mitigated Negative <br />Declaration. Project will replace existing water supply and sewer lines serving the Cities of Dana Point <br />and Laguna Niguel. <br />Water Well No. 39 Hydro -generator Unit Replacement, California Environmental Quality Act <br />Documentation, City of Santa Ana, CA. 2020. Project Manager. Prepared a Notice of Exemption and <br />supporting documentation for the replacement of a hydro -generator unit for Well 39. <br />Water Well No. 32, Initial Study/Mitigated Negative Declaration, City of Santa Ana, CA. 2020. <br />Project Manager. Managing the preparation of an Initial Study/Mitigated Negative Declaration for the <br />rehabilitation of existing Well No. 32 and construction of a new above ground well building and <br />approximately 3,250 linear feet of new pipeline. <br />Central Park Amphitheater, Initial Study/Mitigated Negative Declaration, City of Rancho <br />Cucamonga, CA. 2019. Project Manager. Managed preparation of an Initial Study/Mitigated <br />Declaration for an approximately 40,000 square feet amphitheater on 11 acres located at the Rancho <br />Cucamonga Central Park. Project was completed under an extremely aggressive schedule in order to <br />facilitate a grant application for funding. <br />TETRA TECH <br />