Peter Kim, PE, TE Education:
<br />Traffic Control
<br />Mr. Kim has more than 27 years of experience in transportation and
<br />traffic engineering. His project experience includes numerous traffic
<br />signal designs, street lighting plans, ramp -metering plans, traffic
<br />monitoring stations, signing and striping plans, traffic control plans for
<br />major freeway projects, and traffic impact studies for various
<br />developments. Mr. Kim's knowledge of Caltrans, City and County
<br />Standards, criteria and requirements is outstanding. He has been
<br />responsible for over 20 freeway projects requiring preparation of traffic
<br />design plans and traffic management plans throughout Southern
<br />California. Mr. Kim has also prepared traffic control plans for various
<br />water districts for over 100 projects. Mr. Kim is the owner/principal of
<br />PMK Associates, Inc., a SBE certified firm which provides traffic
<br />engineering services to Tetra Tech along with other commercial and
<br />private clients.
<br />EXPERIENCE
<br />Design of 1,000 GPM PFAS Treatment Plant at existing Well ET-1,
<br />Irvine Ranch Water District, Irvine, CA. 2021 - Present. Traffic Design.
<br />Mr. Kim was contracted by Tetra Tech as the Traffic Engineer for the
<br />preparation of nine (9) traffic control plans on the Irvine Center Drive in
<br />the City of Irvine.
<br />BS, Civil Engineering,
<br />California State Polytechnic
<br />University, Pomona, 1989
<br />11 Reg istrationslCertifications:
<br />Professional Civil Engineer,
<br />California, No. 51616, 1994
<br />Professional Traffic Engineer,
<br />California, No. 1871, 1997
<br />Professional Affiliations:
<br />American Society of Civil
<br />Engineers
<br />Institute of Transportation
<br />Engineers (Associate)
<br />Office Location:
<br />Irvine, CA
<br />Years of Experience:
<br />27
<br />Years with Tetra Tech:
<br />27
<br />Harvard Avenue Trunk Sewer Diversion Structure Rehabilitation, Irvine Ranch Water District,
<br />Irvine, CA. 2020 - Present. Traffic Design. Mr. Kim was contracted by Tetra Tech as the Traffic
<br />Engineer for the preparation of six (6) traffic control plans on Harvard Ave. and Main Ave. in the City of
<br />Irvine.
<br />Regional Lift Station Force Main Replacement, Moulton Niguel Water District, Aliso Viejo, CA.
<br />2017 - Ongoing. Traffic Engineer. Prepared nine (9) traffic control plans in the City of Aliso Viejo.
<br />3.7 MG Zone 1 Reservoir Construction Support, Irvine Ranch Water District, Irvine, CA. 2021.
<br />Traffic Design. The 3.7 MG Reservoir will provide an additional permanent reservoir with storage and
<br />operational flexibility in the Irvine Ranch Water District's Zone 1 system.
<br />Peter's Canyon Channel Water Capture & Reuse Pipeline, Irvine Ranch Water District, Irvine,
<br />CA. 2015. Mr. Kim was contracted by Tetra Tech as the Lead Traffic Engineer for the preparation of
<br />traffic control plans for 17,000 linear feet of pipeline along Harvard Avenue in the City of Irvine.
<br />Carlsbad Seawater Desalination Conveyance Pipeline, Poseidon Resources Corporation,
<br />Carlsbad, CA. 2014. Mr. Kim was contracted by Tetra Tech as the Traffic Engineer Lead for the
<br />preparation of traffic control plans for 52,000 linear feet of pipeline that serves the product water from
<br />the planned 50 MGD desalination plant in the City of Carlsbad. Pipeline diameters ranged from 24-inch
<br />to 54-inch welded steel pipeline operating at a maximum pressure of 800 psi. Seven flow control
<br />facilities were planned. The pipeline was routed through the cities of Carlsbad, San Marcos, Vista and
<br />Oceanside. In addition, there were two bridge crossings, Caltrans right-of-way crossing, railroad
<br />crossing, and several bore and jack crossings located throughout the project. Final Traffic Control plans
<br />were prepared for permitting through the City of Carlsbad and Caltrans.
<br />Anaheim Regional Transportation Intermodal Center (ARTIC), City of Anaheim, CA. Under PMK
<br />Associates, as the Lead Traffic Design Engineer, Mr. Kim was responsible for the 100% PSE for traffic
<br />signals, signing and striping, stage construction, and street lighting for ARTIC; a transit hub designed to
<br />tie together freeways, bus routes, and rail system as well as allow for future expansion to incorporate
<br />the California High -Speed Rail.
<br />TETRA TECH
<br />
|