Laserfiche WebLink
/Leighton <br />METHOD $/TEST <br />REINFORCING STEEL AND PRESTRESSING STRANDS <br />Reber tensile test, s up to No. 11(ASTMA370)................................................65 <br />Reber tensile test, >t No.14 & over (ASTM A370)...........................................200 <br />Reber bend test, up to No. 11(ASTMA370)......................................................65 <br />i <br />Reber bend test, Z No.14 & over(ASTMA370)..............................................200 <br />Resistance butt -welded hoops/bars, tensile test, <_ up to No.10 (CTM 670)....65 <br />Resistance butt -welded hoops/bars, tensile test, z No. 11 & over (cTM 67o)...85 <br />Mechanical rebar splice, tensile test, s up to No. 11 (CTM 670).......................65 <br />Mechanical rebar splice, slip test, _< up to No. 11 (CTM 670)............................40 <br />Mechanical rebar splice, tensile test, >_ No.14 & over (CTM 670)..................200 <br />Mechanical rebar splice, slip test, >_ No.14 & over (CTM 670).......................200 <br />Headed rebar splice, tensile test, <— up to No, 11 (GTM 670)............................65 <br />Headed rebar splice, tensile test, z No. 14 & over (CTM 670) .......................200 <br />Epoxy coated rebar/dowel film thickness (coating) test (ASTM A775/A934)....... <br />45 <br />Epoxy coated rebaddowel continuity (Holiday) test (ASTM A775/A934)............. <br />65 <br />Epoxy coated rebar flexibilitylbend test, up to No. 11 (ASTM A775/A934).......... <br />45 <br />�� <br />u <br />Prestressing wire, tension (ASTMA416).........................................................175 <br />Sample preparation (cutting) .............. ............ ............................ .................. 50 <br />FEE SCHEDULE <br />METHOD $/TEST <br />STREET LIGHTS/SIGNALS <br />LED Luminaires I Signal Modules I Countdown Pedestrian Signal Face <br />Modules (Callrans RSS 86)...................... ..... ........... ........... ....................... 1,300 <br />SPRAY APPLIED FIREPROOFING <br />Unit weight (density, ASTM E605)........................................................................ <br />60 <br />FASTENERS/BOLTS/RODS <br />F3125 GR A307, A325 Bolts, tensile test, s up to 1-114" diameter, plain <br />(ASTM A370).................................................................................................65 <br />F3125 GR A307, A325 Bolts, tensile test, <_ up to 1-1/4" diameter, <br />galvanized (ASTM A370)...............................................................................75 <br />A490 Bolts, tensile test, s up to 1 - 1 A " diameter, plain (ASTM A370)................65 <br />A490 Bolts, tensile test, 5 up to 1-114" diameter, galvanized (ASTMA370) ...... <br />75 <br />A593 Bolts, tensile test, 5 up to 1-1/4" diameter, stainless steel (ASTMA370)...65 <br />F1554 Bolts, tensile test, s up to 1-1/4" diameter, plain (ASTM A370)............100 <br />F1554 Bolts, tensile test, s up to 1-1/4" diameter, galvanized (ASTMA370)... <br />120 <br />SAMPLETRANSPORT <br />Pick-up & delivery (weekdays, per trip, <50 mile radius from Leighton office) ... <br />90 <br />EQUIPMENT LIST <br />ITEM <br />114 inch Grab plates................................................................................5 <br />$UNIT <br />each <br />114 inch Tubing (bonded)....................................................................0.55 <br />foot <br />114 inch Tubing (single)......................................................................0.35 <br />foot <br />318 inch Tubing, clear vinyl................................................................0.55 <br />foot <br />4-Gas meter (RKI Eagle or similar)/GEM 2000...................................130 <br />day <br />Air flow meter and purge pump (200 ccfmin).........................................50 <br />day <br />Box of 24 soil drive -sample rings.........................................................120 <br />box <br />Brass sample tubes..............................................................................10 <br />each <br />Caution tape (1000-foot roll)..................................................................20 <br />each <br />Combination lock or padlock.................................................................11 <br />each <br />Compressed air tank and regulator.. ............................. ..... <br />................. 50 day <br />Concrete coring machine (s6-inch-dia).................................. <br />- ........... 150 day <br />Consumables (gloves, rope, soap, tape, etc.).......................................35 <br />day <br />Core sample boxes................................................................................ <br />11 each <br />Crack monitor Two -Dimensional.. .......................... ................... <br />........... 25 each <br />Crack monitor Thee-Dimensional......................................................... <br />30 each <br />Cutoff saws, reciprocating, electric (Sawzall®).....................................75 <br />day <br />D-Meter Walking Floor Profiler............................................................100 <br />day <br />Disposable bailers .......... ........... .................. ....................... <br />................. 12each <br />Disposable bladders ............................................... ...................... <br />........ 10 each <br />Dissolved oxygen meter,,,,..,.., ............. .............. ............................ <br />45 <br />day <br />DOT 55-gallon containment drum with lid ...................... ......... <br />.............. 65drum <br />Double -ring infiltrometer......................................................................125 <br />day <br />Dual -stage interface probe.:..................................................................80 <br />day <br />Dynamic Cone Penetrometer..............................................................400 <br />day <br />Generator, portable gasoline fueled, 3,500 watts..................................90 <br />day <br />Global Positioning System/Laser Range Finder....................................80 <br />day <br />Hand auger set ..... ............ ....... ................. .......................... _. <br />................ 90 <br />day <br />HDPE safety fence (s100 feet).............................................................40 <br />roll <br />Horiba U-51 water quality meter..........................................................135 <br />day <br />Light tower (towable vertical mast)......................................................150 <br />day <br />Magnehelic gauge.................................................................................15 <br />day <br />Manometer............................................................................................25 <br />day <br />Mileage (IRS Allowable) ...................................................................0.585 mile <br />ITEM <br />$ UNIT <br />Moisture test kit (excludes labor to perform test, ASTM E1907) ........... <br />60 <br />test <br />Nuclear moisture and density gauge....................................................88 <br />day <br />Electrical moisture and density gauge..................................................88 <br />Day <br />Pachometer...........................................................................................25 <br />day <br />Particulate Monitor...............................................................................125 <br />day <br />pH/Conductivity/Temperature meter......................................................55 <br />day <br />Photo -Ionization Detector(PID)...........................................................120 <br />day <br />Pump, Typhoon 2 or 4 stage................................................................. <br />50 <br />day <br />QED bladder pump w/QED control box...............................................160 <br />day <br />Quire fee — Phase I only...................................................................... <br />200 each <br />Resistivity field meter and pins ...................... ...................................... <br />- 50 <br />day <br />Slip I threaded cap, 2-inch or 4-inch diameter, PVC Schedule 40.........15 <br />each <br />Slope inclinometer.......-......................................................................200 <br />day <br />Soil sampling T-handle (Encore)...........................................................10 <br />day <br />Soil sampling tripod...............................................................................35 <br />day <br />Speedy (R) moisture tester......................................................................5 <br />day <br />Stainless steel bailer..............................................................................40 <br />day <br />Submersible pump,10 gpm, high powered Grundfos <br />2-inch with controller.......................................................................160 <br />day <br />Submersible pump/transfer pump,10-25 gpm...................................... <br />50 <br />day <br />Support service truck usage (well installation, etc.).............................200 <br />day <br />Survey/fence stakes................................................................................ <br />8 each <br />Tedlar0bags.........................................................................................18 <br />each <br />Traffic cones (<-25)/barricades (single lane) .......................................... <br />50 <br />day <br />Turbiditymeter......................................................................................70 <br />day <br />Tyvel suit (each)................................................................................ <br />18 each <br />Vapor sampling box...............................................................................55 <br />day <br />Vehicle usage (carrying equipment)..................................................... <br />20 <br />hour <br />VelociCalc..............................................................................................35 <br />day <br />Visqueen (20 x 100 feet).....................................................................100 <br />roll <br />Water level indicator (electronic well sounder) <300 feet deep well.., <br />... 60 <br />day <br />ZIPLEVELO...........................................................................................15 <br />day <br />Other specialized geotechnical and environmental testing and monitoring <br />equipment are available, and priced per site <br />0 Fee; 2022 www lelghtongroup coin Page 3 of 4 <br />