My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (7)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 3:46:03 PM
Creation date
10/4/2022 11:01:40 AM
Metadata
Fields
Template:
Contracts
Company Name
-TETRA TECH, INC.
Contract #
A-2022-158-01
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
10/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0; Leighton <br />f <br />FEE SCHEDULE <br />TERMS AND CONDITIONS <br />0 • <br />Expiration: This fee schedule is effective through <br />supplemental insurance, travel, subsistence, <br />December 31, 2022 after which remaining work will <br />project -specific parking charges, shipping, <br />be billed at then -current rates. <br />reproduction, and other reimbursable expenses will <br />• <br />Proposal Expiration: Proposals are valid for at <br />be invoiced at cost plus 20%, unless billed directly <br />least 30 days, subject to change after 30 days; <br />to and paid by client. <br />unless otherwise stated in an attached proposal. • <br />Invoicing: Invoices are rendered monthly, payable <br />• <br />Prevailing Wages: Our fees for prevailing wage <br />upon receipt in United States dollars. A service <br />A <br />work are based upon California prevailing wage <br />charge of 1 /z percent per month will be charged for <br />laws and wage determinations. Unless specifically <br />late payment. <br />indicated in our proposal, costs for apprentice • <br />Client Disclosures: Client agrees to provide all <br />are not included. If we are required to have an <br />information in Client's possession about actual or <br />apprentice on your project, additional fees will be <br />possible presence of buried utilities and hazardous <br />40 <br />charged. <br />materials on the project site, prior to fieldwork, <br />• <br />Overtime: Standard overtime rate is per California <br />and agrees to reimburse Leighton for all costs <br />gp <br />Labor Law and is billed 2 times their <br />related to unanticipated discovery of utilities and/or <br />� <br />rfor non-exempt <br />hourly billing rate. Overtimee rate <br />hazardous materials. Client is also responsible for <br />field personnel working on a Leighton observed <br />providing safe and legal access to the project site <br />holiday is billed at 2 times their hourly billing rate. <br />for all Leighton field personnel. <br />Overtime rate for Prevailing wage work is per the • <br />Earth Material Samples: Quoted testing unit <br />'! <br />California Department of Industrial Relations (DIR) <br />rates are for soil and/or rock (earth) samples <br />determination and is multiplied at 1.5 to 2 times <br />free of hazardous materials. Additional costs will <br />their hourly billing rate for overtime and double- <br />accrue beyond these standard testing unit rates <br />time, respectively. <br />for handling, testing and/or disposing of soil and/or <br />• <br />Expert Witness Time: Expert witness deposition <br />rock containing hazardous materials. Hazardous <br />and testimony will be charged at 2 times hourly <br />materials will be returned to the site or the site <br />rates listed on the previous pages, with a minimum <br />owner's designated representative at additional <br />charge of four hours per day. <br />cost not included in listed unit rates. Standard <br />turn -around time for geotechnical-laboratory test <br />• <br />Minimum Field Hourly Charges: For Field <br />results is 10 working days. Samples will be stored <br />i3 <br />Technicians, Special Inspectors or any on -site <br />for 2 months, after which they will be discarded. <br />y <br />(field) materials testing services: <br />Prior documented notification is required if samples <br />3. <br />4 hours: 4-hour minimum charge up to the first <br />need to be stored for a longer time. A monthly <br />four hours of work <br />storage fee of $10 per bag and $5 per sleeve or <br />tube will be applied. Quoted unit rates are only <br />8 hours: 8-hour minimum charge for over four <br />for earth materials sampled in the United States. <br />l) <br />hours of work, up to eight hours. <br />There may be additional cost for handling imported <br />Project time accrued includes portal to portal <br />samples. <br />travel time. • <br />Construction Material Samples: After all <br />• <br />Insurance & Limitation of Liability: These rates <br />designated 28-day breaks for a given sample <br />are predicated on standard insurance coverage <br />set meet specified compressive or other client - <br />and a limit of Leighton's liability equal to our total <br />designated strength, all "hold" cylinders or <br />fees for a given project. <br />specimens will be automatically disposed of, <br />3 <br />unless specified in writing prior to the 28-day break. <br />• <br />Outside Direct Costs: Heavy equipment, <br />All other construction materials will be disposed of <br />subcontractor fees and expenses, project- <br />after completion of testing and reporting. <br />specific permits and/or licenses, project -specific <br />wmv eightongroup.rom <br />Pagt 4 Dt 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.