Laserfiche WebLink
REGISTRATION <br />2011/CA/Professional <br />Engineer/C i v i I /77370 <br />EDUCATION <br />2006/BS/Civil Engineering/ <br />California State University, <br />Fullerton <br />CERTIFICATIONS <br />Envision Sustainability <br />Professional/Institute for <br />Sustainable Infrastructure <br />Pipeline Assessment <br />Certification Program/ <br />NASSCO/U-508-7002 <br />Manhole Assessment <br />Certification Program/ <br />NASSCO/U-508-7002 <br />EXPERIENCE <br />With Psomas for 16 years; <br />with other firms for 1 year <br />Maira Salcedo, PE, ENV SP <br />Primary Point of Contact/Senior Project Manager: Water/ <br />Sewer Design <br />Maira Salcedo has 17 years of experience in design of sewer systems, water <br />systems, and report preparation on public works projects throughout Southern <br />California. Her computer experience includes AutoCAD (including Civ413D), <br />ArcView, MS Project, and various spreadsheet and word processing software <br />packages. <br />Experience <br />Bristol Street Water Main Replacement - Santa Ana, CA: Project Engineer <br />for preparation of plans and specifications for replacement of 4,600 LF of <br />16-inch diameter ductile iron pipe that has experienced several leaks and <br />breaks within the past few years due to corrosive soil conditions. Based on <br />recommendations of the corrosivity analysis of the geotechnical report, the <br />design used 16-inch C900 (DR 14) PVC pipe with AW WA C217 wax coating over <br />the ductile iron fittings and valves. The project also included the use of Type V <br />cement in all thrust blocks as the soil was found to be high in sulfates. <br />Orange County Streetcar Project - Santa Ana, CA: Project Engineer for the <br />design of the water system facility relocations and installations in support of a <br />four -mile light rail project in the City of Santa Ana. <br />2018 Sewer Rehabilitation Project - Rossmoor, Los Alamitos, CA: Project <br />Manager for the design of sewer segment rehabilitation in various locations <br />in Rossmoor and the City of Los Alamitos. As District Engineer, Psomas staff <br />reviewed 60,000 feet of sewer system CCTV tapes and made appropriate <br />recommendations for repairs where needed. The rehabilitation design <br />comprised a combination of CIPP lining of approximately 2,830 feet of 8-inch <br />through 18-inch-diameter sewer in 11 separate locations; UV -Cured Point <br />Repairs (trenchless) at 68 locations; removal and replacement of approximately <br />860 feet of 8- and lo-inch-diameter pipe in four areas; and point repairs to <br />8-inch through 18-inch pipe at 14 different locations. Duties included obtaining <br />preliminary encroachment permits from the City of Los Alamitos and the <br />County of Orange, coordination for project advertising, evaluation of the bids <br />received, and recommendation of project award. Construction of the project is <br />anticipated for March 2019. <br />Well 28D Equipping Design - Bellflower, CA: Project Manager for <br />preparation of plans and specifications for new 1,500-GPM, 250-hp vertical <br />turbine well pump equipment, including vertical turbine pump, mechanical <br />piping, bypass valve and air gap connection to storm drain, 600-amp electrical <br />service,1,120 SF masonry pump, electrical, chemical feed, and SCE meter <br />building designed to blend into residential neighborhood, sodium hypochlorite <br />on -site generation system, sodium fluoride feed system, HVAC, plumbing, and <br />fencing. <br />Well 12C, Liberty Utilities - Compton, CA: Project Manager for preparation <br />of plans and specifications for new 1,500-GPM, 150-hp vertical turbine well <br />