Maira Salcedo, pump equipment, including vertical turbine pump, mechanical piping, bypass <br />PE, ENV So valve and air gap connection to storm drain, 400-amp electrical service,1,008 SF <br />masonry pump, electrical, chemical feed, and SCE meter building designed to blend <br />(Continued) into residential neighborhood, bulk sodium hypochlorite on -site generation system, <br />ammonia feed system, sodium fluoride feed system, HVAC, plumbing, and fencing. <br />El Segundo/McKinley/Stanford/131st Water Main Replacement Project - Los <br />Angeles, CA: Project Manager for preparation of plans and bid quantities for the <br />construction of two projects in the City of Los Angeles designated as North Project; <br />El Segundo Boulevard/McKinley Avenue/Stanford Avenue/131st Street Water Main <br />Project; and South Project, McKinley Avenue Water Main Project. The North Project <br />included 1,514 LF of 8-inch ductile iron domestic water pipelines. The South Project <br />included 1,408 LF of 8-inch ductile iron domestic water pipelines. Both projects <br />included the installation of several 6-inch fire hydrants, valves,l-inch services, <br />house -lines, and tie-ins, and the abandonment of 4-inch and 6-inch water mains. <br />The work effort included transferring services from the alleys behind homes into the <br />main residential street. <br />"The Case" Malibu Canyon Road and HRL Water Main Upgrades Project - <br />Malibu, CA: Project Manager for preparation of final design plans for construction of <br />approximately 3,800 LF of 12-inch CML&C welded steel domestic waterline in Malibu <br />Canyon Road and 1,600 LF CML&C welded steel domestic waterline in HRI:s Potter <br />Road for the County of Los Angeles Department of Public Works. Project design also <br />included connections to existing water mains; installation of water meters and fire <br />hydrants; detailing the supply connection to an existing 300,000-gallon water tank <br />and existing 6-inch inlet/outlet piping to a smaller water tank; and a new tank drain <br />pipe to replace the old tank drain pipe on the existing 47,000-gallon tank. <br />Rosecrans Booster Pump Station Replacement Project Initial Study and <br />Mitigated Negative Declaration - Buena Park, CA: Project Manager for this <br />project, which involved construction of a new pump station at the site of the existing <br />Rosecrans Booster Pump Station in order to serve residents and properties in the <br />upper zones of the Buena Park potable water system. Original pumping capacity was <br />less than 3,500 GPM, which did not meet peak -hour (3,531 GPM) or maximum -day - <br />plus -fire (5,395 GPM) demands. The newly constructed 1,949 SF pump station building <br />includes four separate rooms, pump room, electrical room, generator room, and <br />disinfection room, The project also required grading for vehicle turnaround space, <br />installation of a detention basin, and a surge tank pad. <br />As -Needed Water Engineering Design Services -Anaheim, CA: Project <br />Engineer for ongoing professional engineering services under as -needed contracts <br />for the City's Water Services Division of the Public Utilities Department. Projects <br />have included a variety of water facilities design projects including pump station <br />upgrades, domestic well pumping facilities, domestic water reservoir mixing <br />improvements, reservoir and pump station condition assessments and water supply <br />assessments. <br />Construction of Well No. 59 and Destruction of Well No. 36 - Anaheim, <br />CA: Project Engineer for preparation of preliminary design report, plans, and <br />specifications for a new 3,000 GPM, 350 hp vertical turbine deep well pump <br />equipment, including vertical turbine pump; mechanical piping; bypass valve and air <br />gap connection to storm drain; 800-AMP electrical service; 810 SF masonry parapet <br />building with roll -away end for well; bulk sodium hypochlorite feed system; HVAC; <br />plumbing; and masonry fencing. <br />