My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (2)
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:56:35 AM
Creation date
10/4/2022 11:02:32 AM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2022-158-03
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
10/15/2024
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Benjamin Halbach, within the South Long Beach service area that were assessed and recommended for <br />PE, ENV SP replacement or rehabilitation. Psomas reviewed the CCTV and inspection reports for <br />all 74 segments, evaluated the inspection logs and videos. Based upon the review, a <br />(Continued) matrix with recommendations for each segment was developed and reviewed with <br />LBWD to determine the selected design approach. The final design plans resulted <br />in 59 segments (or about 17,000 LF) to be lined (CIPP), 20o feet to be removed and <br />replaced from manhole to manhole, 23 segments (or 237lineal feet) of point repair/ <br />pipe replacement and 24 segments (or 106lineal feet) of segment lining. <br />West Street/Candy Lane Water Improvements - Garden Grove, CA: Staff <br />Engineer for preparation of plans and specifications for approximately 8,600 LF of <br />8- and 12-inch domestic water pipeline replacement. Project included permitting and <br />coordination with Caltrans and Union Pacific Railroad. <br />Hermes Street, Water Pipeline Replacement, Golden State Water Company - <br />Los Angeles County, CA: Staff Engineer for the Hermes Street project which is <br />located in GSWC's Norwalk System and includes design of approximately 4,800 feet <br />of 8-inch ductile iron pipe. The existing 4- and 6-inch cast iron mains are currently <br />in the backyards of homes and this project is relocating the water mains to the street <br />right-of-way for better maintenance. The project area consists of five residential <br />streets, including Hermes Street, Achilles Street, Kalnor Avenue, Kenney Street and <br />Lakeland Road. <br />Gardena Boulevard Area Main Replacements, Phases 1, II and III - Gardena <br />and Los Angeles, CA: Staff Engineer for preparation of plans and specifications <br />for approximately 8,600 LF of 8- and 12-inch domestic water pipeline replacement. <br />Project included permitting and coordination with Caltrans and Union Pacific <br />Railroad. <br />Cerritos Avenue from Euclid Street to Alley East of 9th Street Sewer Siphon <br />Removal - Anaheim, CA: Staff Engineer for this project that involved analyzing the <br />City's sewer system to determine the feasibility of the removal of two existing sewer <br />siphons. The first siphon crossed the Orange County Public Works channel, which <br />is a double 8-foot-wide by 8-foot-high reinforced concrete box in the intersection of <br />Cerritos Avenue and 9th Street. The second siphon was also near this intersection <br />and crossed an existing 48-inch storm drain pipe. The project included the <br />replacement of 500 feet of existing sewers in the alley east of 9th Street as part of the <br />recommendations of the Combined Central Anaheim Area Master Plan of Sanitary <br />Sewers prepared in September 2006. In addition, a hydraulic modeling analysis of <br />potential alternative alignments and flow routing scenarios was performed, along <br />with the preparation of a preliminary design report, design review workshop, and <br />preparation of construction plans and specifications. <br />Well 12C Design - Compton, CA: Design Engineer for designing a wellhead <br />building including a pump room with space for required electrical and <br />instrumentation equipment, and water disinfection equipment room with on - <br />site chlorine generation equipment and a water treatment equipment room with <br />fluoridation and ammonia systems. Plan sheets addressed civil site -work components <br />including grading, fencing, on -site piping, valves, meters, and other mechanical <br />equipment including the well pump, structural, plumbing, disinfection, electrical, <br />instrumentation, landscape architectural and irrigation elements. The project also <br />included preparation of a geotechnical report and a site boundary and design survey. <br />Psomas prepared almost a thousand pages of technical specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.