Laserfiche WebLink
EDUCATION <br />1997/BA rch/Arc h itect u re/ <br />California State Polytechnic <br />University, Pomona <br />CERTIFICATIONS <br />Certified Construction <br />Manager/Construction <br />Management Association <br />of America/2594 <br />Envision Sustainability <br />Professional/Institute for <br />Sustainable Infrastructure <br />Designated Design -Build <br />Professional/Design -Build <br />Institute of America <br />EXPERIENCE <br />With Psomas for 16 years; <br />with other firms for 7 years <br />Reuben Tolentino, ccM, DBIA, ENV SP <br />Construction Manager <br />Reuben Tolentino has 23 years of experience in providing construction <br />management and inspection services. His experience includes management <br />of staff and consultants, project management, construction management and <br />inspection, constructability review, value engineering, construction documents <br />and specifications, claim dispute resolution, contract administration, <br />community outreach, bidding assistance, project controls, and scheduling <br />review for both the public and private sectors. <br />Reuben's projects include federal, state, and privately funded projects from <br />small tenant improvements to large construction programs. His vertical <br />construction management experience consists of office buildings, police <br />stations, correctional facilities, fire stations, 911 call centers, city hall <br />renovations, community centers, airport facilities, theme parks, retail <br />developments, libraries, holding tanks, and residential projects. Reuben has <br />also provided these services for horizontal projects including infrastructure, <br />roadway construction, traffic signals, landscaping, pavement rehabilitation, and <br />spill containment projects. <br />Experience <br />Linda Vista Reservoir and Pump Stations - Anaheim, CA: Principal -in - <br />Charge providing construction management for this critical domestic water <br />storage and pumping facility that includes a 4 MG partially buried water storage <br />tank and a 22,600 GPM, dual zone booster pumping station. The City selected <br />Psomas to prepare the design and provide construction management services <br />to replace the aging reservoir with a new 4 MG prestressed, partially buried <br />concrete tank and pump station improvements. The existing pump station <br />drew water from wet wells floating off the existing reservoir with water surface <br />elevations ranging from near ground surface to to feet below grade. The new <br />tank is mostly above ground, raising the tank overflow elevation to 30 feet <br />above ground. <br />As -Needed Engineering Services - Coronado, CA: Construction Contract <br />Manager responsible for managing professional services scope, schedule, <br />budget, quality and resources for various construction management and <br />inspection task orders on public works projects. Projects included pump <br />stations, stormwater infiltration, storm drains, streets, curbs and gutters. <br />Westhaven Booster Pump Station - Garden Grove, CA: Project Manager <br />on this $2 million project that involved replacing existing booster pumps <br />and gas engines with electric motors, while maintaining the current pump <br />station discharge capacity, and replacing the existing well pump engine with <br />an electric motor. The conversion of the station from natural gas to electric <br />power necessitated the addition of a new concrete masonry unit building next <br />to the existing pump station to house a permanent emergency engine generator <br />as well as the electrical panels and switchgear. The project included a variety <br />