Reuben Tolentino, of vaults, conduits, piping, valves, flow meters, controls, and instrumentation
<br />CCIA, DBIA, ENV replacement and repair items to update the facilities and repair deficiencies.
<br />SP (Continued) Headworks Improvements at Water Reclamation Plant 4 and Water
<br />Reclamation Plant 7 - Thermal and Indio, CA: Principal -in -Charge for this $29
<br />million wastewater treatment plant project for Coachella Valley Water District
<br />(CV WD). The work included similar headworks improvements at both Water
<br />Reclamation Plant (WRP) 4 and WRP 7. The physical construction at each site
<br />included: underground piping modifications; large buried structural concrete
<br />influent headworks facility with two influent fine screens, screening conveyor,
<br />screening compactors, and screening storage and disposal facility; influent pump
<br />station complete with three variable -speed raw sewage pumps; new grit removal
<br />facility building, which houses a grit removal system and bypass, grit pumping
<br />system, grit cyclone and grit classifier, and grit storage and disposal facility; new
<br />bio-tower facility for the removal of odors; and associated site improvements at both
<br />locations. Additionally, the WRP 7 project included street widening of portions of
<br />Avenue 38 and Madison Street, with street frontage improvements, including new
<br />landscaping, sidewalks, and block walls for visual screening.
<br />Rehabilitation of West Garden Grove Well 22/13ooster Pump Facility -
<br />Garden Grove, CA: Principal -in -Charge for this $3.2 million project. The project
<br />consisted of the removal of the existing and installation of new natural gas engines,
<br />vertical turbine pumps, right angle drive, LPG system, pump discharge and piping,
<br />and other associated equipment. Also, included was the retrofit and improvement
<br />of the existing roof system, pump station floor drain system, sump pump and vault
<br />structure, and the Murphy control panel. This project also included PLC and SCADA
<br />programming and integration services and miscellaneous electrical wiring. The
<br />project also entailed removing the existing insertion venturi meter and installation
<br />of new magnetic flow meter in the existing meter vault, removal of existing and
<br />installation of new roof hatch and exterior double doors, and painting and finishing
<br />of existing and new building improvements.
<br />Unilever HPC Engineering Support Services - Los Angeles, CA: Construction
<br />Manager for the installation of two 10,000 gallon pre -cast concrete holding tanks
<br />and a custom catch basin with pumps and controls for secondary spill containment
<br />of this personal care soap manufacturer's raw product tanks. The tank installation
<br />required permanent shoring and confined space entry procedures. The project also
<br />included rehabilitation of failed paving in front of the company's loading docks.
<br />All work was performed while the plant remained in operation. Responsibilities
<br />included reviewing submittals, construction observation and inspection, tracking
<br />and responding to contractor RFIs, change order negotiations, schedule review, and
<br />project close-out.
<br />California American Water Company On -Call Inspection Services -
<br />Statewide, CA: Principal -in -Charge responsible for providing inspection services for
<br />various water infrastructure improvements and rehabilitation projects throughout
<br />the Monterey area. Work included waterline replacement, trench excavation,
<br />bedding, backfill, asphalt base, paving, striping, pressure testing, disinfection, and
<br />other related tasks. Projects included Seaside North Small Mains Replacement, Hillby
<br />Tie -In, Hidden Hills Small Mains Replacement, Aguajito Water Main Replacement,
<br />Folsom Booster Pump Station, Fairgrounds Bridge Pipeline, General Jim Moore
<br />School Pipeline, and the Toro Water Plant.
<br />
|