Laserfiche WebLink
Reuben Tolentino, of vaults, conduits, piping, valves, flow meters, controls, and instrumentation <br />CCIA, DBIA, ENV replacement and repair items to update the facilities and repair deficiencies. <br />SP (Continued) Headworks Improvements at Water Reclamation Plant 4 and Water <br />Reclamation Plant 7 - Thermal and Indio, CA: Principal -in -Charge for this $29 <br />million wastewater treatment plant project for Coachella Valley Water District <br />(CV WD). The work included similar headworks improvements at both Water <br />Reclamation Plant (WRP) 4 and WRP 7. The physical construction at each site <br />included: underground piping modifications; large buried structural concrete <br />influent headworks facility with two influent fine screens, screening conveyor, <br />screening compactors, and screening storage and disposal facility; influent pump <br />station complete with three variable -speed raw sewage pumps; new grit removal <br />facility building, which houses a grit removal system and bypass, grit pumping <br />system, grit cyclone and grit classifier, and grit storage and disposal facility; new <br />bio-tower facility for the removal of odors; and associated site improvements at both <br />locations. Additionally, the WRP 7 project included street widening of portions of <br />Avenue 38 and Madison Street, with street frontage improvements, including new <br />landscaping, sidewalks, and block walls for visual screening. <br />Rehabilitation of West Garden Grove Well 22/13ooster Pump Facility - <br />Garden Grove, CA: Principal -in -Charge for this $3.2 million project. The project <br />consisted of the removal of the existing and installation of new natural gas engines, <br />vertical turbine pumps, right angle drive, LPG system, pump discharge and piping, <br />and other associated equipment. Also, included was the retrofit and improvement <br />of the existing roof system, pump station floor drain system, sump pump and vault <br />structure, and the Murphy control panel. This project also included PLC and SCADA <br />programming and integration services and miscellaneous electrical wiring. The <br />project also entailed removing the existing insertion venturi meter and installation <br />of new magnetic flow meter in the existing meter vault, removal of existing and <br />installation of new roof hatch and exterior double doors, and painting and finishing <br />of existing and new building improvements. <br />Unilever HPC Engineering Support Services - Los Angeles, CA: Construction <br />Manager for the installation of two 10,000 gallon pre -cast concrete holding tanks <br />and a custom catch basin with pumps and controls for secondary spill containment <br />of this personal care soap manufacturer's raw product tanks. The tank installation <br />required permanent shoring and confined space entry procedures. The project also <br />included rehabilitation of failed paving in front of the company's loading docks. <br />All work was performed while the plant remained in operation. Responsibilities <br />included reviewing submittals, construction observation and inspection, tracking <br />and responding to contractor RFIs, change order negotiations, schedule review, and <br />project close-out. <br />California American Water Company On -Call Inspection Services - <br />Statewide, CA: Principal -in -Charge responsible for providing inspection services for <br />various water infrastructure improvements and rehabilitation projects throughout <br />the Monterey area. Work included waterline replacement, trench excavation, <br />bedding, backfill, asphalt base, paving, striping, pressure testing, disinfection, and <br />other related tasks. Projects included Seaside North Small Mains Replacement, Hillby <br />Tie -In, Hidden Hills Small Mains Replacement, Aguajito Water Main Replacement, <br />Folsom Booster Pump Station, Fairgrounds Bridge Pipeline, General Jim Moore <br />School Pipeline, and the Toro Water Plant. <br />