Laserfiche WebLink
M is ha Troya n, PE, and inspection task orders on public works projects. Projects included pump stations, <br />QSD (Continued) stormwater infiltration, storm drains, streets, curbs and gutters. <br />Third, Fourth and I Avenue Storm Drain Project - Coronado, CA: Project <br />Manager for full-time, on -site field inspection of the installation of approximately <br />2,000 feet of new storm drain pipes ranging in size between 24- and 48-inch <br />diameters. In addition, two stormwater pumps will be installed along the new pipe <br />alignment, and the reconstruction of an existing outfall into San Diego Bay including <br />placement of riprap. Inspection services include inspecting project materials to <br />verify compliance, attendance at pre -construction meeting, daily inspection reports, <br />photographic and video documentation of pre -construction and post -construction <br />project site conditions, and assistance with the preparation of project punch list. <br />Survey services were also included in Psomas' scope. <br />Port of San Diego, Chula Vista Bayfront Construction Management Services <br />- San Diego, CA: Resident Engineer for the Chula Vista Bayfront project serving as <br />the District's representative during pre -construction, bid/award and construction on <br />both developer -led projects and Port -managed projects. Current projects under the <br />first phase of the program include the Costa Vista RV Park, Sweetwater Bicycle Path <br />& Promenade, Soil Cleanup and Demolition, RIDA Resort Hotel & Convention Center, <br />Sweetwater Park and Harbor Park. <br />El Norte Project Improvements Project - Escondido, CA: Project Manager for <br />providing inspection support services including structures inspection, geotechnical <br />testing and inspection, and materials testing and inspection. Project challenges <br />include demolition and pile driving in close proximity to an existing 36-inch water <br />line, traffic control, and cyclist/pedestrian safety on an active recreation trail <br />through the project site. <br />San Diego County Water Authority, 112A Pump Station Improvement Project <br />- Greater San Diego Area, CA: Construction Manager responsible for managing <br />scope, budget, schedule and quality of design -build project for rehabilitation and <br />upgrades to Valley Center pump station rehabilitation project. Project scope included <br />development of final design and construction documents; installation of three new <br />13.7 cfs vertical turbine pumps; removal and replacement of various electrically <br />actuated valves (butterfly, sleeve, V-port ball, knife gate, plunger); new pump motor <br />variable frequency drives (VFDs), motor control centers (MCCs), an active harmonic <br />filter (AHF), redundant PLCs; and building improvements. <br />San Diego County Water Authority, PCCP Relining Aqueduct Protection <br />Program - Greater San Diego Area, CA: Served as Resident Engineer or <br />Construction Manager managing scope, budget, schedule and quality for multiple <br />large -diameter pipeline rehabilitation projects. Tasks included monitoring and <br />evaluating schedule updates, providing cost control via Earned Value, issue tracking <br />and claims avoidance, reviewing and negotiating change orders, overseeing Quality <br />Assurance program and client/stakeholder coordination. <br />