Laserfiche WebLink
k j , . <br />REGISTRATION <br />2004/CA/Professional <br />Engineer/Civi I/66019 <br />EDUCATION <br />1999/BS/Civil Engineering <br />and Environmental <br />Engineering/University of <br />California, Berkeley <br />CERTIFICATIONS <br />Qualified SWPPP <br />Developer/California <br />Stormwater Quality <br />Association/23566 <br />EXPERIENCE <br />With Psomas for 3 years; <br />with other firms for 20 <br />years <br />Misha Troyan, PE, QSD <br />Resident Engineer <br />Misha Troyan is a senior project manager at Psomas with 23 years of experience. <br />He is responsible for the procurement and execution of project/construction <br />management professional services contracts in the San Diego region within the <br />transportation, water/wastewater, infrastructure, and public works markets. <br />Experienced in public works construction management, organizational <br />management, and contract administration for various project delivery methods <br />including CM/GC, design -build, and design -bid -build. <br />Experience <br />Construction Management As -Needed Support Services, San Diego <br />County Water Authority - San Diego, CA: Project Manager/Task Order <br />Manager responsible for managing professional services scope, schedule, budget <br />and resources for various public works project task orders. Services included <br />construction management, resident engineering, constructability reviews, <br />quality assurance inspection, estimating and document control. <br />PCCP Relining Aqueduct Protection Program, San Diego County Water <br />Authority, Various Projects within the County- San Diego, CA: Served as <br />Resident Engineer or Construction Manager managing scope, budget, schedule <br />and quality for multiple large -diameter pipeline rehabilitation projects. Tasks <br />included monitoring and evaluating schedule updates, providing cost control via <br />Earned Value, issue tracking and claims avoidance, reviewing and negotiating <br />change orders, overseeing Quality Assurance program and reporting and <br />communication with the client and project stakeholders. Specific projects <br />include: <br />► Pipeline 3 Relining: Sweetwater to Lower Otay <br />► Pipelines 3 and 4 Relining: Miramar to Scripps Ranch <br />P. Pipeline 4 Relining: Paint Mountain to Del Dios Highway <br />► Pipeline 4 Relining: Del Dios Highway to Black Mountain Vent <br />San Diego County Water Authority, Pump Station Improvement <br />Project -Twin Oaks Valley Water Treatment Plant: Construction Manager <br />responsible for managing scope, budget, schedule and quality of design - <br />build project for rehabilitation and upgrades to Valley Center pump station <br />rehabilitation project. Project scope included development of final design and <br />construction documents; installation of three new 13.7 cfs vertical turbine <br />pumps; removal and replacement of various electrically actuated valves <br />(butterfly, sleeve, V-port ball, knife gate, plunger); new pump motor variable <br />frequency drives (VFDs), motor control centers (MCCs), an active harmonic filter <br />(AHF), redundant PLCs; and building improvements. <br />As -Needed Engineering Services - Coronado, CA: Construction Services <br />Task Order Manager responsible for managing professional services scope, <br />schedule, budget, quality and resources for various construction management <br />