My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:58:15 AM
Creation date
10/6/2022 9:45:15 AM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC
Contract #
A-2022-158-06
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
9/1/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On -Call Water Resources Engineering Services <br />Quality Control is the responsibility of each and every team member. It includes the selection of <br />project team members who have demonstrated the experience and the ability to understand and apply <br />the project objectives to achieve a specific goal. It also requires open and continuous communication <br />between all team members. <br />Timely reviews are provided prior to making submittals. Before plans are submitted to outside parties <br />and the City, a senior member of TAIT will conduct a detailed review of the design to verify the quality, <br />constructability and completeness of the documents to be submitted. If a Value Engineering measure is <br />identified by the reviewer, it will be discussed with the Project Manager to determine the next <br />appropriate action (i.e.: implement the measure, review the measure with the City, or conduct <br />additional analysis to determine the feasibility and potential cost savings). At the completion of TAIT's <br />in-house review, the design documents are returned to the design team for corrections. The Project <br />Manager is then responsible to ensure that all review comments have been properly addressed prior to <br />submittal of the plans and reports for agency review and approvals. TAIT understands the needs of <br />public agencies and their projects, and we lool<forward to proving our value to the City on your <br />upcoming design engineering projects, <br />Understanding of Szcope of Se-rvices <br />TAIT understands and is committed to fulfilling all items in the RFP`s scope of services forthis contract <br />with both our in-house services and our sub -consultants (Sub). Below is a matrix depicting this <br />commitment to the core services. <br />We can similarly perform all additional services the City needs on a project -by -project basis. <br />Civil -Engineering Design I TAIT <br />Structural I TAIT <br />eotechnical I TAIT Sub-SoCalGeo <br />Land Surveying I TAIT <br />Architectural TAIT <br />Landscape Architectural and <br />Irrigation TAIT Sub-CDPC <br />Environmental I TAIT & TAIT Sub-TBD <br />Electrical I TAIT Sub-tklsc <br />Mechanical TAIT Sub-tklsc <br />Instrumentation and Control <br />Systems TAIT <br />Financial and Economic Consulting <br />Engineering TAIT & TAIT Sub-TBD <br />j�� TAIT Page 1 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.