My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:58:15 AM
Creation date
10/6/2022 9:45:15 AM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC
Contract #
A-2022-158-06
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
9/1/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santiago PaArk Nursery <br />City of Santa Ana, CA <br />TAIT provided the [ity'sWater Department with surveying and design <br />services todefine the reuse ofthe abandoned portion ofSantiago Park, <br />once used bythe Santa Ana Police Department asacanine training area <br />The scope ofservices included topographic and boundary services to <br />identify the existing improvements for demolition in providing "clean <br />site" for re -use asaCity demonstration area for drought tolerant <br />landscape and irrigation. |maddition, new fencing and apathway tn <br />connect this area toother portions ofthe Park were delineated. <br />1E.ast Stztio.n. Pe'00e-ter Wall <br />Pro�r-ct <br />City of Santa Ana, CA <br />TAITbcurrently providing the [ity'sWater Department with surveying, <br />design, and landscape architecture services todesign and construct anew <br />[K8U perimeter wall at the East Pump Station Located within the City. The <br />new perimeter wall was required tmprovide higher security for the site <br />which was currently experiencing ahigh percentage ofindividuals <br />attempting toenter the site <br />The scope of services included topographic and record boundary services <br />to identify the existing improvements for demolition, design of new <br />perimeter wall and security system, street improvements, landscape <br />improvements, and coordination of on and offsite utilities. The project <br />scope also expanded toinclude the design and survey oftwo additional City <br />facilities which required the preparation of an extensive record of survey to <br />document incorrect prior monumenta1ion of the roadway. Survey efforts <br />were extensive and required coordination with City surveyor aswell asthe <br />County surveyor inordertoobtain approval nfthe revised record ofsurvey. <br />Design isanticipated tubecompleted inSummer of2022and Construction <br />is currently pending. <br />Reference Contact: <br />Robert Aguirre, PE <br />Client: <br />City ofSanta Ana <br />Design Cost: <br />$17,400 <br />Project Dates: <br />Design: September 2OZI- <br />yNay.2O22 <br />Project Team; <br />P|[:Jacob Vandemis <br />PM: Todd Broussard <br />QA/QC: David Sloan <br />Reference Contact: <br />Armando Fernandez, PE <br />Clients <br />City mfSanta Ana <br />Design Cost: <br />$13Z/3OO <br />Project Dates: <br />Design: ZO2O-2O22 <br />Project Team: <br />PIC:Jacob Vasdervb <br />PM: David Sloan <br />QA/QC: Todd Broussard <br />Page17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.