Laserfiche WebLink
TAIT &Aasudates Inc. <br />On -Call Water Resources Engineering Services <br />Design Field Walk <br />This sub -task includes all hours necessary forthefiehd,ev|ewandde*ignrequiredtoobseweand <br />document the existing site conditions and to identify anticipated work items. Existing condition <br />photos will be taken along the project limits in order to aid the City in construction coordination. All <br />field notes will be compiled and stored imthe design file for reference. <br />Preliminary Design & Layout (30% Plans) <br />TAIT will prepare 30% layout plans are part of this task and will submit to the City for review and <br />verification ofthe proposed alignment and layout ofimprovements. Upon city review and approval <br />of the proposed alignment and improvements TA[Twill initiate the plan and profile preparation <br />stage. <br />Deliverables: <br />* Field Walk Notes <br />/ Preliminary Findings {l30%Layout Plans (Digital & Hard Copies) <br />Q\2 Final Plan Preparation <br />Upon City confirmation of the preferred design alternative, TAIT will initiate the preparation of the 60% <br />PS&Epackage. The following are the anticipated sheet counts for the proposed plan set: <br />Title Sheet <br />1 <br />Notes, &Typical <br />Details <br />Water Main <br />Plan & Profile <br />Water & Sewer <br />Main Connection <br />2 <br />3 <br />Details <br />2-phase Traffic <br />Control Plans <br />Total Sheet <br />The key components ofthe plan package are described below - <br />Title Sheet <br />A title sheet will be prepared for each Bid Set (total of two) and will include all City of Chino <br />standard notes, a vicinity map predicting the |acst|wn of each pipe replacement segment, a list of <br />utility contacts and project abbreviations and legends. The Title Sheet (and the rest ofthe plan set) <br />will beprepared unthe City standard title block on24^x38"bond paper. <br />] rAn Page 14 <br />��—� —_ <br />