My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:58:15 AM
Creation date
10/6/2022 9:45:15 AM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC
Contract #
A-2022-158-06
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
9/1/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TA|T&Assmc|a'es inc, <br />On -Call Water Resources Engineering Services <br />TAIT will conduct field survey and prepare the base mapping per RFP requirementsutilizing our in-house <br />surveying services. Per the RFPrequirements, the pricing for surveying services has been included ata <br />prevailing wage rate. The scope of Field Surveying includes: <br />Design Field Surve <br />Upon issuance nfNTP,TA[Tsurvey will conduct afield control and topographic omn/eya1euch <br />project location in order toobtain the required topographic e|ements. <br />Project Base Mal2ping <br />As part of this contract, TAIT will prepare the following base mapping for incorporation in the <br />project design: <br />w Topographic <br />° Right ofway <br />• Existing Utility <br />It is assumed that the City will provide TAIT with any available GIS and record base maps forthe <br />project limits (Right ofWay & Utility) tuaid inthe preparation ofthe base maps. TA|TvviU <br />format and update the base mapping with the noted existing records and all other applicable <br />existing improvements (loops, signal equipment, striping, legends, etc.). |tiaanticipated that <br />right qfway base mapping will beper record documents only, and that the City will provide all <br />available right of way and property records to TAIT at the design kickoff meeting. <br />Upon completion mfthe base mapping activities, TA|Twill convert the topographic survey and <br />aerial survey base mapping to the required GIS shapefile format and will input available <br />metaclata for the utility facilities which were observed and found during the records research. <br />All data will be exported per the RFP requirements and submitted to the City via FTP server <br />transfer. <br />Deliverables: <br />/ Field Survey Data <br />~ CAD Project Base Map <br />D, 1 Preliminary EiazfinAand AlLgumemt Selecttioo <br />During and upon completion of the previous tasks, TAIT will initiate the preliminary engineering analysis <br />and alignment selection task. This project includes the design and analysis ofnine separate project <br />segments. The location and proposed alignment for the water mains will be analyzed in order to <br />determine the most ideal location and path for both features. TAIT will utilize the geotechnical <br />investigation provided bythe City in conjunction as part ofthis initial design. This task includes: <br />| T4n Page 1 l] <br />�_-1-_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.