Laserfiche WebLink
TAIT6kAssocates,Inc, <br />On -Call Water Resources Engineering Services <br />V 10096PS&E <br />Prior to each submittal, TAIT will conduct a full QA/QC review per our quality assurance protocols <br />described mLthe end ofthis section. Additionally, TA|Twill plot, compile and deliver the noted number <br />and format ofP5@Eto the City for each submittal per the RFP requirements. <br />Deliverables: <br />/ 6O%Plans (4Hard Copy Sets) <br />/ 9O%Plans (4Hard Copy Sets) <br />* 1OO96Plans (4Hard Copy Sets) <br />E Trqffic Control Plans <br />Traffic Handling Concept Coordination with Cit <br />At/aff ichandling concept a,approach for the project will hmdiscussed with the City inconjunction <br />with the city's review of the 60% PS&E documents. The purpose of the traffic handling concept <br />coordination efforts will be to identify site issues/traffic circulation concerns that will form the basis <br />of understanding for final traffic control requirements based on a specific project segment. Based on <br />the discussion with the City, the project segments that require the preparation of a Traffic Control <br />Plans as part of the bid documents will be identified. The actual preparation of the project's Traffic <br />Control Plans will be provided as an Optional Task. <br />The Bid Set specifications, developed under Work Task {iand the traffic control/handling notes <br />reflected on the construction plans will be prepared to provide clear delineation of the City's <br />requirements for the contractor's implementation oftraffic control requirements for project <br />segments where a project specific Traffic Control Plan has not been prepared. <br />Traffic Control Plans — OPTIONAL TASK <br />TAIT and TAIT's Subconsultant (TJW Engineering, Inc.) will prepare two-phase Traffic Control Plans <br />for the City designated project segments based on the results of the conceptual traffic handling <br />discussions with the City as an Optional Task. A cost per typical single location based on a 2-phased <br />traffic control plan per project segment has been provided. <br />The City -requested Traff icControl Plans will then heprepared for submittal tothe City atthe 9O% <br />and 100% stages. The Traffic Control Plans will be prepared based on city ao'bu1ltstreet plans and <br />images obtain from aerial photographs and will be developed per the California Manual of Uniform <br />Traffic Control. <br />/ Traffic Handling Coordination meeting Notes at5O% Stage <br />� Traffic Control Plans at 90% Stage (Digital & Hard Copy), if requested by the City <br />/ Traffic Control Plans at 10096 Stage (Digital & Hard Copy), if requested by the City <br />/ 1._TAn_ Page 11G <br />— <br />