Laserfiche WebLink
T, Assn _: t c_ <br />,ram On -Call Water Resources Engineering Services <br />El Salvador Park Regional infiltration Basin,. City of Santa Ana, Principal in Charge & QA/QC Manager, <br />2020 <br />Principal in Charge & QA/QC Manager of the full service civil engineering design services associated with <br />a planned regional water quality basin at El Salvador Park in the City of Santa Ana. The scope of work <br />included the design and analysis of two parking lots located off of Civic Center Drive as well as a vacant <br />corner lot located at the intersection of Civic Center & English Street for the planned infiltration basin, <br />Packer Place Linear Park Dry Creek & Drainage improvements, City of Lake Forest, Principal in Charge <br />& QA/QC Manager, 201-2020 <br />Principal in Charge & QA/QC Manager of the full service civil engineering design services to mitigate <br />drainage ponding and flooding that was occurring at Packer Place linear park between the Packer Place <br />Cul De Sac and Cavanaugh Drive.. <br />Bristol Street and Civic Center Drive Water Quality improvements, City of Santa Ana, Principal in <br />Charge & QA/QC Manager, 2020 <br />Principal in Charge & QA/QC Manager of the civil engineering design services associated with water <br />quality improvements on the Bristol Street and Civic Center Drive Improvement Project. <br />WQMP/OMP Design for the El Toro 20 Acre RV Storage Lease, City of Irvine, Principal in Charge & <br />QA/QC Manager, 201-2020 <br />Principal in Charge & QA/QC Manager of the Water Quality Best Management Practices (BMP) and <br />included cost estimates, coordination with the client, development of construction plans for the BMP's <br />installation, and the design and approval of a connection to an existing Grange County Flood Control <br />facility. <br />Foothill Water Main Replacement Project, Los Angeles County, Golden State eater Company, Project <br />Manager, 201 <br />Project Manager & Principal in Charge of the work being conducted by all TAIT staff to provide Design <br />Engineering Service for then $2.5 M water main replacement project throughout six locations in Los <br />Angeles County for Golden State Water. Primary responsibilities were to review and stamp water main <br />replacement plans and specifications, supervise design engineers and coordinate with client and <br />contractor through the design and construction phases. <br />Abridged List of Additional Project Experience byJake: <br />ormandie Ave. Water Line Improvements, Golden State Water Company, Principal in Charge, <br />Harbor Blvd, Storm Drain and Street Reconfiguration Project, City of Garden Grove, Principal-in- <br />Cha rge <br />On -Call Engineering Services, grange County Public Works, Principal -In -Charge <br />100 Acre Parcel Development El Toro Marine Base, Orange County Public Works, Irvine, CA, <br />Project Director <br />City Hall Underground Fuel Storage Tank Removal and Replacement, City of Irvine, Principal -In - <br />Charge <br />T I Appendix 122 <br />