Laserfiche WebLink
: TAIT Assod _-. Inc. <br />On -Call Water Resources Engineering Services <br />s 9uBossr .E,3 i` <br />QAIQC MANAGER <br />In addition to 14 years of private development experience (9 of those with <br />TAIT), Mr. Broussard has over 21 years of municipal design and project <br />management experience as Principal Civil Engineer with the City of Huntington <br />Education <br />Beach Public Works Department, overseeing an annual Capital Improvement <br />Master of Public <br />Program budget of approximately $25 million per annum. Project specific <br />Administration, California <br />responsibilities included street improvements, wastewater, stormwater, and <br />State University <br />special projects outside of the public right of way for the City as detailed below. <br />B.S. -- Civil Engineering, <br />Sewer Master Plans principal in charge, 2005 <br />University of Louisiana, <br />As Principal in Charge, oversaw the consultant preparation of the City's Sewer <br />Lafayette <br />Master Plan and subsequent focused Sewer Flow Study to identify capacity <br />Year of TAIT Team <br />related improvements for the City's approximately 500 miles of sewer mains <br />Enhs'ment <br />and 31 sewer lift stations. <br />2021 <br />(1989-1997) Previous <br />Sanitary Sewer Monitoring Program (SSMP), Principal in charge, 2010 <br />Total Experience <br />Served as Principal in Charge to develop the City's initial SSMP and served on <br />35 <br />the Waste Discharge Regulation (WDR) Steering Committee, to develop the <br />Certifications <br />County of Grange SSMP guidelines. <br />Professional Engineer <br />California No. C57144 <br />Sewer Lin. Z, projects, Engineer o. Recor d/Principal in Charge, 2002-2021 <br />CWEA Grade IV <br />Served as Engineer of Record and/or Principal in Charge of approximately fifteen <br />Wastewater Collection <br />individual sewer lining projects, totaling approximately 150,000 lineal feet of 8" <br />Associations <br />to 18" sewer main lines, utilizing both "fold and form" and "cured in place" <br />American Public Works <br />lining methods. Projects also included lining of adjacent sewer manholes, <br />Association <br />primarily with polyurethane coatings. <br />American Society of Civil <br />Engineers <br />earner Avenue Sewer Upgrade Project, P incipag-€n-Charge, 2014 <br />California Water <br />Served as Principal in Charge overseeing consultant designed gravity sewer amain <br />Environment Association <br />upgrade project. This project upsized the existing sewer main utilizing the micro <br />tunneling methodof construction. <br />Sewer Lift Station Rehabilitation Projects, Principal in Charge, 2003-2019 <br />Served as Principal in Charge, overseeing consultant design, for ten sewer lift <br />station rehabilitation projects. Most projects were completely rebuilt adjacent <br />to the existing lift stations, due to effects of the marine environment on the <br />existing structures. Most projects required either dewatering and/or tremie <br />seal insitu construction due to high ground water. <br />Drainage Master Plans, Principal in charge, 2005 & 2018 <br />Served as Principal in Charge overseeing two consultant prepared Drainage <br />Master Plans. Many of the City's approximately 200 miles of storm drains and <br />l <br />i� i- • Appendix 123 <br />