Laserfiche WebLink
TA|T& Associates, Inc - <br />On -Call Water Resources Engineering Services <br />sidewalk to create pedestrian linkage to the PV Nature Preserve entrance. These improvements are <br />constructed along Crenshaw Boulevard/Burma Road, between Park Place and Burrell Lane. <br />Vincent Street Sanitary Sewer Rehabilitation, Redondo Beach, CA <br />Project engineer for the design, preparation nfthe civil plans and construction management for the <br />building of an approximate 745 LF parallel sewer system near the Vincent Street Park and surrounding <br />neighborhoods, <br />Phase 2 Neighborhood Street Rehabilitation, City of La Mirada, CA <br />Project engineer for roadway improvements, street resurfacing and appurtenant infrastructure repairs. <br />Provided PS8'Eaarequired, for bidding and construction ofthe proposed improvements. The intent of <br />this project was to renovate the roadway pavement and hardscape leaving the neighborhood with a like <br />nevvappearance.APP'sinitia|recommendationwastomiU0.5°ofthenxistingpavernent(axoiding <br />impactingtheexist|n8macadam)'constructZ~ufnempavementformuchoftheroa6vvay^remove4^of <br />the outside six feet of A.C./macadam, and construct 4" of new A.C. pavement and resulted in significant <br />cost savings for the City relative to the approach they used in previous years. <br />Firestone Boulevard Median Project, DmxwneKCA <br />Project engineerfor raised median islands, entry monument sign, street rehabilitation and water <br />facilities improvements on Firestone Boulevard between Old River School Road and West City Limits. <br />Work includes preparation of traffic study, complete plans, technical specifications and estimate (PS&E) <br />for the proposed improvements, providing the bidding document, suitable for bidding and award of a <br />formal unit price public works construction contract, and construction support. <br />Lincoln Avenue Widening, Amehe|rn, CA <br />Performed hydrology and hydraulic calculations as well as catch basin sizing due tuthe moving of <br />existing catch basins in Lincoln Avenue. <br />Brookshire Avenue Pavement Rehabilitation, Downey, CA <br />Served asproject engineer responsible for assisting the project engineer onthe road rehabilitation <br />project for the City ofDowney, CA. The project included rehabilitation ofthe street toanew centerline <br />profile while utilizing the existing curb and gutter location and elevation. <br />Sidewalk Evaluation and Analysis, Santa Fe Springs, CA <br />Served asproject engineer responsible for assisting the project team and the City of Santa Fe Springs by <br />' analyzing sidewalk inspection data, developing a representative unit price cost estimate for repairs, <br />preparation of a summary report and incorporation ofthe evaluation into the [ity'sexisting GiSsystem. <br />Richmo�Street Arterial Improvements, Ell Segundo, CA <br />Project engineer responsible for providing engineering services for Richmond Street arterial <br />improvements located between El Segundo Blvd. and Holly Ave. within the downtown area for 1,600 <br />lineal feet with 60 feet of street and sidewalk width. Design work includes street, sidewalk, parking, <br />survey, traffic and landscape improvements. <br />' �un Appendix 13O <br />�.__—_ <br />